Mobile
Log In Sign Up
Home > chinese-english > "水建筑物" in English

English translation for "水建筑物"

release work

Related Translations:
建筑物测量:  building surveying
文教建筑物:  educational building
建筑物评估:  building evaluation
缓冲建筑物:  buffer buildings
居住建筑物:  inhabited buildingresidential buildingresidential structures
建筑物特点:  building characteristic
在建建筑物:  construction structure
建筑物外壳:  building envelope
建筑物支柱:  building column
建筑物间距:  clearance of buildingsdistance between buildingsspacing of building
Example Sentences:
1.Water - surrounded structure
水建筑物
2.Hydraulics research on main conveyance structures in diversion project from south to north china
南水北调工程主要输水建筑物的水力学研究
3.Design of layered water intake structures for reservoir under consideration of temperature control of discharge water
基于下泄水温控制考虑的水库分层取水建筑物设计
4.Its good effect is proven by actual operation , providing reference for solving the seepage problem in water feeding structures
为根本上解决输水建筑物接缝止水渗漏问题提供了借鉴和参考。
5.The culvert is the works buried under the fillings , which is often used in hydraulics , communication , and water supplying engineering
涵洞是埋设在填土下的输水建筑物,它在水利、交通、供排水工程中被广泛使用。
6.The geological condition for marliba reservoir project is quite complicated , for which some technical problems are to be solved there , such as the water conveyance structures have to be arranged on super - deep soft foundation
摘要麻栗坝水库工程地质条件复杂,存在需要在超深软基上布置输水建筑物等难点技术问题有待解决。
7.The improper excavating will bear capacity , water permeability , natural structure and geological structure worsenning the base rock of foundation . , this ca n ' t be allowed to the water conservancy project building , especially to block water building . lt will not only increase the expenses happened of the remedy measure , but also lengthen building straight line time limit for a project of construction
开挖不当将降低基岩的承载能力、增大基础的透水性、恶化基岩的天然结构和地质构造,这对于水工建筑物,特别是挡水建筑物是不能允许的,同时将会增加采取补救处理措施所发生的费用,延长建筑物施工直线工期。
8.Abstract : through a series of hydraulic model tests for researching actual power tunnel operation , a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage , flow velocity and pressure intensity . the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage
文摘:针对实际工程中的发电引水隧洞运行的各种工况进行了水工模型试验研究,指明要获得良好的水流流态,过水建筑物各部位结构轮廓的造型应适应水流流线的收缩、流速及压强的变化;为使引水隧洞在各级引水流量下能安全可靠地运行,需慎重确定洞内消能工的体形和尺寸。
9.The large water conservancy engineering transporting water from south to north will relieve the lack of water resource of north - west and north - china regions . it has been wrote into " tenth five - year plan " of china . as a building spanning rivers to transport water , large - scale aqueduct plays an important role in this water conservancy engineering
南水北调水利工程是为缓解我国西北及华北地区水资源缺乏而将兴建的大型水利工程,现已列入我国“十五”发展计划,其中大型渡槽作为跨越河流等的输水建筑物在南水北调水利工程中占有重要地位。
10.In low developed non - karat mountain area , the main water supply patten is fetching water from a river , water - fetching building is built mostly on the bank or at the bottom of the river , it seemed to be fetching water from underground , but the quantity of the water depends on the runoff of the river , so it has close relationship with surfacewater actually
摘要人类利用开发程度较低的非岩溶山区一般以近河取水为主要供水方式,取水建筑物多位于河岸或河底,从供水形式上看属于取用地下水,但取水量的大小依赖于河流流量,因此实质上和地表水关系更加密切。
Similar Words:
"水见" English translation, "水箭" English translation, "水箭龟" English translation, "水涧" English translation, "水涧石" English translation, "水僵" English translation, "水僵, 水性肌强直" English translation, "水僵水性肌僵直" English translation, "水浆" English translation, "水浆处理" English translation