| 1. | Claims and anti - claims of shuibuya hydropower station during construction 水布垭水电站施工中的索赔与反索赔 |
| 2. | Research on geo - mechanics parameters of dayantang landslide in shuibuya 水布垭大岩淌滑坡岩土力学参数试验研究 |
| 3. | Study of the high - speed flow through the spillway of the shuibuya water control project 水布垭溢洪道高速水流问题研究 |
| 4. | Impact of rheological property of rockfill on shuibuya concrete faced rock - fill dam 堆石流变性对水布垭面板堆石坝性状影响的研究 |
| 5. | Regularity of karst growth on the left bank of shuibuya dam and its permeability analysis 水布垭大坝左岸岩溶发育规律及渗透性分析 |
| 6. | Preliminary study on increasing the maximum output of the generating sets in shuibuya power station 水布垭电站机组增设最大出力初探 |
| 7. | The application of temperature control amp; anti - crack design of concrete in shuibuya project 混凝土温控与防裂设计在水布垭工程中的应用 |
| 8. | Trial production blasts of the rock filling materials for shuibuya concrete face rockfill dam 水布垭混凝土面板堆石坝填筑料开采爆破试验 |
| 9. | The application of temperature control amp; amp; anti - crack design of concrete in shuibuya project 混凝土温控与防裂设计在水布垭工程中的应用 |
| 10. | Technology research of compression side wall of shuibuya concrete faced rock - fill dam and application 水布垭面板堆石坝挤压边墙技术研究及应用 |