| 1. | It was constructed on rock, using rubble masonry and stood about 48ft. high . 它是一座建造在岩石上,高约48英尺,由毛石砌成的石工建筑。 |
| 2. | Pointed squared - rubble wall 有勾缝的毛石墙 |
| 3. | Rubble stone retaining wall 毛石挡土墙 |
| 4. | Its round shaped and made of stone . there were two strange points about this well 井深两丈余,井筒圆形,井壁为毛石垒砌。 |
| 5. | Rock fill mound foundation 毛石堆地基 |
| 6. | Cement rubble masonry 水泥毛石圬工 |
| 7. | Figure 7 - typical section of rock fill mound foundation for cooling water pumping station 图7 -冷却用水抽水站毛石堆地基剖面图 |
| 8. | The use of a vertical seawall resting above the rock fill mound would minimize the width of the base 在毛石堆上建造垂直海堤可减少底座的阔度 |
| 9. | Contract procedures for building works - part c : general technical specifications for building works ; ashlar works 建筑工程合同.第c部分:建筑工程通用技术规范.毛石作 |
| 10. | The rock fill mound has the lowest construction cost , about 9 million for the criii including the cost of rock -毛石堆的造价最低,占中区填海第三期工程约900万元包括石填料的成本。 |