Mobile
Log In Sign Up
Home > chinese-english > "施工进度计划" in English

English translation for "施工进度计划"

detailed construction schedule; construction schedule
job schedule


Related Translations:
同步进度表:  synchronized time schedule
水利工程施工:  hydraulic engineering construction
施工队长:  spread superintendent
作业施工:  job execution
施工准备:  mobilizationpreliminary work for construction; preparations forpreparation of constructionpreparations for construction
施工编号:  construction number
施工车辆:  construction vehicle
施工监测:  observation during and after construction
施工规程:  construction regulations
铺面施工:  pavement construction
Example Sentences:
1.Scheduling for construction under fixed risk probability
基于一定风险水平的施工进度计划研究
2.Detailed construction schedule ; construction schedule
施工进度计划
3.5 . the project completion probability is discussed , which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit
5 .进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
4.In the end , an evaluation system has been developed according to the cascade analytical method in order to make a scientific evaluation to the construction scheme , the project scheduling and the layout system of the drawings
最后,本文利用层次分析法,开发了施工组织设计评价系统功能模块,从而对施工方案、施工进度计划和施工平面布置图的确定做一个科学的、量化的评价。
5.This database is the core of project management and information management , realizing data exchang among the scheduling system , the layout system of the drawings and the information management system on site
此外,本文还设计了工程项目数据库,作为工程项目管理和信息管理的核心,实现工程项目管理的各个模块,施工进度计划、施工平面布置图和施工现场信息管理之间数据的交互。
6.The construction processes of large - scale underground structure group are very complicated . in order to quicken the construction processes , reduce price and assure success , it is necessary that adopting scientific system simulation method to simulate the whole construction processes , to make all tunnels , all activities and all machine equipment harmonious and make construction sequence schedule reasonable
大型地下洞室群施工过程是极其复杂的,采用科学的系统仿真方法对地下洞室群施工全过程进行模拟,使各洞室、工序及施工机械设备相互协调配合,使洞室群施工顺序和施工进度计划更加合理,对于加快洞室群施工进度,降低工程造价,保证工程顺利进行非常必要。
7.Discusses the optimizing process of treatments of the main technical problems , which include the construction schedule , the field plan and t he balance of earth and rock works , method of the river closure and cofferdams sections , procedure and time of the river colsure , form of the cutoff , construct ion of the cut - off walls
论述了三峡大江截流及二期围堰实施过程中的施工进度计划、料场规划与土石方平衡、截流方式与围堰断面形式、截流进占程序和时段、防渗形式、防渗墙施工等主要技术问题的优化完善过程
8.For the elevation of the scientification and rationality of the construction organization designment and construction management in the modern construction projects , an computer aided design system of integration of construction schedule and layout drawing has been researched and developed in this paper . with this cad system we can realize the layout of the drawings and the compiling of the construction schedules separately , and also this system can used to exchange the data between the two separate systems , and then they can express each other
为了提高现代建筑工程项目施工组织设计和施工管理的科学性和合理性,本文以电厂建设工程项目为例研究和开发了集成化的施工进度计划和施工布置的计算机辅助设计系统,利用该系统不仅可以独立的实现施工布置和施工进度计划的编制,而且可以利用开发的自定义文件进行这两种系统的数据交流和表达。
9.The main parts of this paper is now be showed in the following : 1 ) the development for the compiling of the schedule had been finished 2 ) the realization of the management function for the schedule system , the base managements can be processed with the management tools . 3 ) the data taken and expressed from the drawing layout system , in the schedule system . 4 ) the data transfer from the schedule system to the drawing layout system
本文的研究工作主要包括以下几个方面: 1 )适合电厂工程的进度计划编制功能的开发完成; 2 )实现电厂工程的施工进度计划管理功能,可以利用施工进度计划编制系统的管理工具对施工进度计划进行基本的管理; 3 )实现在施工进度计划定制系统中对施工平面布置系统中的数据的读取和表达; 4 )完成施工进度计划数据向施工平面布置系统的传送。
10.Based on practical engineering experience , a suit of template for project scheduling system including the commonness of different engineerings has been customized . in addition , some special functions have been added to it . they are the updating of the completion of tasks , the relationship with the construction ration , data exchange between the scheduling system and the layout system of the drawings and the picturing of the earned curve , etc . besides , the project database has been designed in accordance with the theory and criterion for database design
本文根据现场工程经验,总结不同工程中存在的共性,在project2000基础上定制开发了电力安装工程施工进度计划模板,并且在该模板上增加了一些其特有的功能,包括:任务的更新,与施工定额相联系,与施工平面布置图中数据的交互以及利用赢得值原理绘制赢得值曲线等。
Similar Words:
"施工结束" English translation, "施工津贴" English translation, "施工进场坡道" English translation, "施工进度" English translation, "施工进度表" English translation, "施工经济学" English translation, "施工经理" English translation, "施工经验" English translation, "施工卷扬机" English translation, "施工开始" English translation