| 1. | Ordinary construction way , relative poor convenience 一般施工方式,便利性稍差 |
| 2. | Spatial effects on mid - partition due to excavation of a double - arched tunnel 开挖施工方式对连拱隧道中墙影响的空间分析 |
| 3. | The puzzle of highway construction enterprise reform caused by the change of construction patterns 从公路施工方式的转变谈公路施工企业改革的困与惑 |
| 4. | Nowadays different seismic acquisition team has different characteristics in engineering investment and operation , leading to variable quality of collected seismic data 目前各家施工队伍在力量投入、施工方式等方面各具特色,采集到的资料质量也不尽一致。 |
| 5. | Different from the construction of rc , the construction of pc needs high technique . there is a close relation between design and construction , and different manner of construction would result in different internal force of structure 预应力混凝土结构的施工不同于普通钢筋混凝土结构的施工,其对技术有较高的要求,且预应力结构在设计与施工上关系密切,施工方式的不同有可能造成结构内力的不同。 |
| 6. | The thermal conductivity of aluminum plate has a good thermal conductivity , so that the heating system is fast and heat distribution is uni tally friendly . heating rate is 4 . 5 times higher than the traditional , so as to achieve rapid heating effect 科学设计的导热铝板,安全牢固的嵌入万能模板中,结实、平整且能够承载,发挥其高效的传导性能、环保性能,比传统的混凝土施工方式节省40 %以上的燃料费,供热效率在200 %以上。 |
| 7. | By analysis of the transfer function and modal shape , we can draw a conclusion that this system is different from the common frame structure and even different from other types of structure with special - shaped columns . so the necessity of the studying has been verified 通过对传递函数的分析以及对模态振型的回归计算,找到了该结构体系由于其特殊的施工方式和构造措施与一般框架结构体系及异形柱填充墙体系相比所具有的特点。 |
| 8. | Also , 40m - length fore - and - aft antique city walls will be utilized to establish the 3d elastic finite - element model . in this case , a reasonable construction technique will be attained as the impact of tunnel construction on terrestrial sedimentation of antique city - wall sectors as well as the stability of mid - 以及取古城墙前后40m的长度范围,建立三维弹塑性有限元模型,考虑隧道施工对古城墙段的地表沉降的影响以及中隔墙在时空上的稳定性,得出较为合理的施工方式。 |
| 9. | However construction - phase water quality impacts in deep bay , terrestrial and marine disturbance and construction - phase disturbance impacts to dolphins in urmston road remain potential issues of concern . it will be necessary to carefully investigate construction methods and mitigation measures that can keep cumulative impacts to acceptable levels 然而,施工期间工程对后海湾水质的影响及对陆地生态、海洋生态和在龙鼓水道出没的海豚的滋扰,仍可能备受关注,故必须审慎研究施工方式和缓解措施,使累积影响维持在可接受的水平。 |