English translation for "施工效率"
|
- efficiency of construction
operating efficiency
Related Translations:
水利工程施工: hydraulic engineering construction 施工队长: spread superintendent 施工编号: construction number 施工车辆: construction vehicle 施工监测: observation during and after construction 施工规程: construction regulations 铺面施工: pavement construction 施工技术: co truction technologyconstruction techniqueconstruction technologyengineering tchniquesengineering techniquesoperating technique
- Example Sentences:
| 1. | Discussion on the quantity of contractors ' efficiency loss in construction claims 关于工程索赔中承包商的施工效率损失的定量探讨 | | 2. | And the thinner flake of same color and pattern can be pasted on same paper regularly to increase constructing efficiency 而且还可以将较窄的同色同花木皮规律地贴在同张纸上,以提高施工效率。 | | 3. | No sinkhole and hige successful hole rate , so that the consumption for rolled up powder and anchor shank bits could be reduced sharply . construction efficiency could be promoted , and labor intensity could be reduced . a wide range of rock formation , it could be used in rock formation with f 不易缩径,成孔率高,极大的减少了药卷锚杆的浪费提高了施工效率,降低了工人劳动强度适岩性广泛,在f | | 4. | By using depth - measurable band drains , the supervision engineer or engineering managerial personnel can measure or spot check the embedded depth of each band drain after construction if they were not at site when band drains were being driven , thus improving the construction efficiency and ensuring the engineering quality 使用可测深型排水板可提高施工效率,当监理工程师或工程管理员不在现场对排水板打设进行直接监督和管理时,施工后可以对每根排水板埋设的深度进行测量或抽查,因而可有效控制和杜绝人为造成的偷工减料,确保施工和工程的质量。 | | 5. | Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel , this paper discusses some corresponding countermeasures including the improvement of ground property , appropriate draining of groundwater , scheduled excavation depth and width , etc , to control strata distortion and surface settlement , and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation 摘要针对深圳地铁浅埋暗挖隧道施工中影响地表下降及地层变形的因素,提出了遵循“十八字”原则、改善土体特性、适度排放地下水、根据地层条件选择施工方法、增大左右线隧道开挖面的距离、合理确定开挖进尺、提高施工效率、加强初期支护、及时施作二次衬砌等对策。 |
- Similar Words:
- "施工详图" English translation, "施工详图;施工图则" English translation, "施工项目" English translation, "施工项目编号" English translation, "施工项目管理" English translation, "施工性能" English translation, "施工需电量" English translation, "施工许可" English translation, "施工许可证" English translation, "施工延期" English translation
|
|
|