| 1. | Foundation ditch checkout is a important work before base was construct 基础施工前的重要工作 |
| 2. | Before constructing , should remove surface dust or other incidentals 施工前应清除表面尘土或其它杂物。 |
| 3. | The surface must be free from oil , grease and dirt , and be dry prior to painting 施工表面必须除净油污和杂质,并在施工前务必保持干燥。 |
| 4. | The surface must be free from oil , grease and dirt , and be dry prior to application 施工表面必须除去油污和杂技,在施工前务必保持干燥。 |
| 5. | The surface temperature must be above the dew point . dry surface completely before application 表面温度必须在露点以上,施工前彻底干燥表面。 |
| 6. | Chinese medicinal plants from the dangerous slope were moved to another slope nearby 中药园施工前的危险斜坡危险斜坡上的中药植物移植至附近斜坡 |
| 7. | The every day meeting of workforce class prior to construction should pick up hse requirement and educate personnel pertinently 施工前施工班的每日会议应提出hse要求并切实教育员工。 |
| 8. | By incorporating security concepts into the design of new premises , costs can be saved by identifying design flaws prior to their construction 即是鼓励建筑师和规划者在施工前把保安概念融入楼宇的设计,防患于未然。 |
| 9. | Claims can further be mitigated substantially if plans and specifications are thoroughly checked and revised before starting of construction 如果在工程项目施工前,能够检查、修正各类计划和技术规范,那么施工索赔就能够缓解。 |