Mobile
Log In Sign Up
Home > chinese-english > "支模" in English

English translation for "支模"

form erecting erection of shuttering
Example Sentences:
1.High form erecting in design amp; construction of the storm - proof playground of foshan health school
佛山卫校风雨操场高支模的设计与施工
2.Innovative technique of support mould for double shear wall in deform joint of high rise building
高层建筑变形缝处双剪力墙支模的创新技术
3.Application of foreign pneumatic formwork construction method in thin concrete shell construction
国外气压支模施工法在混凝土薄壳施工中的应用
4.The application of triangle homolateral supporting bar inclined shore in prevent waterwave concret wall
混凝土防浪墙支模三角形同侧拉杆斜撑的应用
5.Utilizing the new method , a system of construction safety appraisal for ftsf is presented
借助于该评估方法,建立了扣件式钢管支模架施工风险评估体系。
6.This paper introduces the preloading model set technological in heating furnace , preloading model set technological can increase the quality of heating furnace and the life of furnace lining highly
摘要在加热炉中采用预加载荷支模工艺,能提高加热炉施工质量,大大提高炉衬寿命。
7.To evaluate the safety of fastener - style tubular steel formwork - support ( ftsf ) in project management , a safety assessment of multi - level and multi - attribute system was established on the basis of consultation with a number of ftsf experts
为了评估现场扣件式钢管支模架的施工风险,设计了一套多指标多层次的扣件式钢管支模架的施工风险评估系统。
8.Resurvey the column axis and elevation line , and mark out the column form line , 1 : 2 cement mortar will be used to leveling at the column bottom . “ 井 ” shape rack will be set around each column , and mark elevation control line on it
将柱轴线、标高线复测投点,弹出柱支模线,将柱脚支模处用1 : 2水泥砂浆找平,每根柱周围搭设井字架,在井字架上抄测标高控制线。
9.The thesis has summarized the development of the oblique - pull bridge , its construction technology and the importance of bridge construction control , then has introduced project general situation , and has narrated detailed regulation , organization construction , the major work and difficult part of this bridge construction control . the following is the key part of this thesis , firstly , it has introduced the experiment work of early stage , structural calculation and its theoretical result : the absolute altitude of each operating mode , the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then , it has discussed the method and content of the line shape control of the main beam , actual absolute altitude of building mould is put forward , and it has described the method of structural stress monitoring , how to arrange measure point and collect data , and how to analyze data . it has also narrated the method of rope force detection and structural temperature inspection
本论文在总结了斜拉桥的发展及其施工工艺,并指出了桥梁施工控制的重要性之后,简要的介绍了工程概况,叙述了炳草岗金沙江大桥监控细则、组织机构及监控的主要工作和难点部分;论文的核心部分,在介绍了炳草岗金沙江大桥施工控制与监测工作的前期实验工作和施工各工况标高、各节段支模标高、浇注混凝土后的标高的结构计算和其理论计算结果之后,详细论述了主梁的标高线形控制方法和内容,实际支模标高的提出,结构应力监控的方法、布点、测读及其对测读数据的合理分析方法,索力检测和结构温度监测的方法。
10.The paper expounds the constructing technology to assure the operating quality of the afterward casting zone from five aspects , namely the water reducing measure within afterward casting zone , shuttering construction , surface treatment at earlier casting concrete and reinforcing steel , selecting additives for afferward casting concrete , and the operating and curing technology used to afterward casting concrete
摘要从后浇带部位的降水措施、支模方法、先浇砼及钢筋的表面处理、后浇砼外加剂的选择、后浇砼的浇筑及养护等五个方面,论述了保证防水砼后浇带施工质量的施工技术措施。
Similar Words:
"支脉线" English translation, "支脉族" English translation, "支脉蕨" English translation, "支霉粘毒" English translation, "支霉粘毒〔一种霉菌毒素" English translation, "支模板" English translation, "支模板装置" English translation, "支母末" English translation, "支木" English translation, "支木柱" English translation