| 1. | The old aswan dam was a barrage . 老的阿斯旺坝是一个拦河闸。 |
| 2. | Study on repair technique of sluice and dam destroyed by flood 水毁拦河闸坝修复修补技术研究 |
| 3. | Design of energy - dissipating structure for wushi sluice rehabilitation 乌石拦河闸除险加固工程消能建筑物的设计 |
| 4. | Discussion on optimizing design of stilling pool in low - head sluice across river 低水头拦河闸消力池优化设计探讨 |
| 5. | Study on renewal of gates and lifts of liuqiao sluice on tuhaihe river 徒骇河刘桥拦河闸闸门及启闭机更新改造研究 |
| 6. | Discussion of the dam design and management from the danger occurring in jimei sluice 从积美拦河闸坝出险谈闸坝工程的设计与管理 |
| 7. | Causation analysis and rehabilitation technique research of flood damage in sanhe river sluice 三合拦河闸水毁成因分析与改造技术研究 |
| 8. | Liuqiao sluice on tuhaihe river is a sluice with 10 gates built on the downstream of tuhaihe river in liaocheng city , which operates for many years 摘要徒骇河刘桥拦河闸是聊城市境内徒骇河下游一座10孔拦河节制闸,已运行多年。 |
| 9. | And from the end of the reservoir , a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir . from the reservoir , water further gravitates to hong kong . the dongshen water supply scheme started at the qiutou ( 东深工程运河起自广东省东莞市桥头县,流经司马、旗岭、马滩、塘厦、竹塘、沙岭、上埔、雁田及深圳等地,全长83公里,主要建设包括6座拦河闸坝和八级抽水站。 |
| 10. | Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying , design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no . 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying , design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength , stability and thermal control problem for xi - luo - du project 溪洛渡水电站超大型地下洞室群围岩稳定的安全可靠性分析:被成都勘测设计研究院应用于比选报告及可行性论证中; ( 2 )小关子水电站拦河闸坝及地基的应力应变分析:被成都勘测设计研究院应用于地基加固处理方案; ( 3 )三峡厂房7 # - 14 #坝段温控并缝措施研究:为厂房坝段并缝方案的可行性提供了依据; ( 4 )堤防工程体系的长期监控预报预警决策系统开发:为监控、预测预报堤防渗漏管涌破坏提供分析软件; ( 5 )向家坝地下洞室群围岩稳定的安全可靠性分析:被中南勘测设计研究院应用于初步设计方案中; ( 6 )靠船墩的疲劳可靠度研究:为广东航运规划设计院的靠船墩优化设计和加固提供依据; ( 7 )溪洛渡高拱坝坝体坝基(坝肩)强度和稳定的三维静动力随机有限元分析及可靠度计算:为溪洛渡重大工程坝体的静动力安全稳定性及温控方案提供依据。 |