English translation for "总工期"
|
- total project duration
Related Translations:
总工办: general engineer's office 总工时: total productive hours 总工长: chief foremangeneral foreman 总工室: chief-engineer office 总工资: gross earningstotal wages 总工作含量: total work content 总工业储量: total ultimate reserves 联合总工业: united general industries
- Example Sentences:
| 1. | Smaller , overlapping subtasks can have a shorter total duration than the original longer task 小而重叠的子任务的总工期将比原来大任务的工期短。 | | 2. | These latter two types of links automatically overlap tasks , which tends to decrease the overall project duration 后两种链接类型自动地重叠任务,这将趋于缩短项目的总工期。 | | 3. | You can indicate how much progress has been made on a task by entering the percentage of the total task duration that has been completed 输入任务总工期的完成百分比,可以指示某个任务的进度情况。 | | 4. | Besides , it lodges that , to reach the aim of optimizing compress , there needs to forecast the best total time for an entire project , bringing forward a request for study of chapter four 提出了如果需要达到最优化压缩的目的,需要预测整个项目的最优总工期的问题,为第四章的研究提出了要求。 | | 5. | We could save the constructing period and promote the constructing ability because we don ' t fabricate in work - site . whenever we must construct quickly , to set up the unit from upstairs to downstirs . we could shorten the time especially for the high - rise buildings and improve the benefit of investing 施工周期短,由于工地不进行组装,节省了工地的工作量,而且还可以在土建施工时,自上而下的安装,使层高建筑的总工期大大缩短,提高了投资效益。 | | 6. | As a kind of method expounded of late years that computes the numerical value of time claimed , dynamic analysis method ( d . a . m ) evaluates delay influence on construction time by contrasting the network condition before delay occurrence with the network condition after delay occurrence 动态分析法是近年来提出的计算施工延误工期索赔值的一种方法。该方法通过对某一施工延误发生前和该延误发生后前网络状态的差异,来评定该诞误对总工期的影响。 | | 7. | The generation is coinciding with the probability distribution for the same work procedure . for one turn of simulation , the rigid network plan algorithm is used . after enough turns of simulation , the distribution of the total work period can be determined , at the same time the critical path and time parameters can be found in the pnp 本文首先论述了网络计划发展的几个方面,然后引入概率理论与统计知识,建立起一个概率型网络计划模型,在此基础上阐述了工序工期与网络总工期的概率分布的判定与拟合方法,通过中心极限定理同时辅助于计算机数值仿真法,对网络计划做出了一些统计分析,同时提出了概率型网络的关键路线的确定方法。 | | 8. | The concept of all - factors engineering network is raised . the types of engineering delay , and the ways to recognize the claim chance delay are discussed . the calculating model of distribution engineering delay responsibility and the quantitative analysis model of employer ' s engineering delay loss are set up 5 、对总工期延误给业主带来的影响进行了全面系统的分析;提出了变粒度全因素工程网络图的概念,探讨了工程延误的类型和识别工程延误索赔机会发现的方法;给出了分配工程延误责任的计算模型和业主总工期延误损失定量分析模型。 |
- Similar Words:
- "总工程师,主任工程师" English translation, "总工程师菲力土" English translation, "总工程司" English translation, "总工会" English translation, "总工会报" English translation, "总工时" English translation, "总工室" English translation, "总工室主任工作职责" English translation, "总工业储量" English translation, "总工资" English translation
|
|
|