| 1. | There are four . one of them is an emergency generator 四台。其中一台是应急发电机。 |
| 2. | Automatic supply test of emergency generator 应急发电机自动供电试验。 |
| 3. | Load and performance test for main generator ( emergency generator ) 主发电机(应急发电机)负荷及特性试验。 |
| 4. | Provide two independent means to start the emergency generator engine 应急发电机柴油机应有两套独立的起动方法 |
| 5. | Insulation of emergency generator room ( including a60 insulation ) 应急发电机室绝缘(包括应急发电机室a60绝缘) 。 |
| 6. | Automatic governing test of voltage and frequency for main generator ( emergency generator ) 主发电机(应急发电机)电压、频率自动调节试验。 |
| 7. | Testing of the emergency diesel generator in both manual and automatic modes , as applicable , for at least 20 minutes 用手动和自动两种方式试验应急发电机,如可行,至少20分钟。 |
| 8. | At the lower part of emergency generator fuel oil tank there is oil fence , auxiliary engine daily service tank has oil pan 4应急发电机组燃油柜下面设置围油栏,辅机日用油柜设置油盘。 |
| 9. | Coupling of the emergency generator on the emergency switchboard , checking the operation and checking that all emergency functions are satisfactory 确认应急发电机和应急配电结合,保证应急功能满足。 |
| 10. | Fore peak tank , fresh water tank , ballast tank , emergency generator fuel oil tank use sounding pipe , sludge tank use short sounding pipe 2艏尖舱、淡水舱、压载舱、应急发电机组燃油柜采用测量管测量,污油舱使用短测量管。 |