| 1. | It can economize half of slurry more than traditional skill 较传统工法节省水泥50 % 。 |
| 2. | Application of smw method in tunnel engineering 工法在隧道工程中的应用 |
| 3. | However , the plan was stopped , because the war ended ?时设计简略工法代用资材登场标准形? |
| 4. | The typical technique application in water gate station construction 闸站施工中典型工法的应用 |
| 5. | Construction methods of inverted thermal insulation and waterproof roofing 倒置式保温防水屋面施工工法 |
| 6. | Testing study and application of shape steel pullout in smw construction method 工法型钢起拔试验研究及应用 |
| 7. | Incremental launching method 节块推进工法 |
| 8. | Construction method of driven cast - in - pi ace pile with later - implanted steel cage 后植入钢筋笼灌注桩成桩施工工法的应用 |
| 9. | Ecological engineering methods 生态工法 |
| 10. | Precast segmental method 预铸节块工法 |