| 1. | Improvement of short hole blasting technique 中深孔阶段崩落法在新华钼矿的应用 |
| 2. | An experimental study on the block caving system in fengshan copper mine 丰山铜矿自然崩落法的试验研究 |
| 3. | Study on productive exploration grid of natural caving in tongkuangyu mine 铜矿峪矿自然崩落法生产探矿网度研究 |
| 4. | Some critical issues in application of pillarless sublevel caving method 无底柱分段崩落法应进一步研究的几个问题 |
| 5. | Prediction and control of tunnel rock burst in nonpillar sublevel caving 无底柱分段崩落法巷道岩爆预测与防治措施 |
| 6. | On the cover caving in the sublevel caving of slightly dipped thick orebody 缓倾斜厚矿体无底柱分段崩落法放顶方式探讨 |
| 7. | Study on ore loss and dilution in pillarless sublevel caving based on sls system 系统的无底柱崩落法矿石损失贫化的研究 |
| 8. | The method to determining optimal structure parameter of non - pillar sublevel caving 无底柱分段崩落法最佳结构参数的确定方法 |
| 9. | Mining horizontal pillars with hydraulic roof propping in longwall caving method 在长壁式崩落法中用液压支柱护顶回采水平矿柱 |
| 10. | Research on the influence of structural parameters of sublevel caving on ore drawing results 无底柱分段崩落法结构参数对矿石回收指标的影响研究 |