| 1. | Seepage inspection underwater and repair for upstream gate shaft in wanyao reservoir 碗窖水库上游坝面闸门井水下渗漏检查和防渗施工 |
| 2. | Effect of unsymmetrical solar thermal radiation on thermal stresses of high arch dams 左右岸日照差异对高拱坝下游坝面温度应力的影响 |
| 3. | Compensate concrete construction technology practice in rock - fill dam panel in northern area 北方地区堆石坝面板补偿混凝土施工技术实践 |
| 4. | ( 2 ) the changing in dam gradient affects the energy dissipation and erosion prevention 坝面坡度的改变,对消能防冲有一定的影响。 |
| 5. | ( 3 ) the roughness of the dam body has a little effect on the energy dissipation and erosion prevention 坝面糙率对围堰和坝体的消能防冲影响不大。 |
| 6. | Research on the design based on computer simulation for the project of flowing construction in the rock - fill dam 基于计算机仿真的堆石坝坝面流水施工方案研究 |
| 7. | Application of distributed optical fiber temperature sensing technology to leakage monitoring for rock - fill dams with face slabs 分布式光纤温度传感技术用于面板堆石坝面板渗漏监测 |
| 8. | A method is set forth to calculate the hydrodynamic pressure influence matrix of elastic dam using series development and linear superposition theorem in this paper 利用级数展开和线性叠加原理,本文给出了一种求取弹性坝面动水压力影响系数矩阵的数值算法。 |
| 9. | The measuring points are placed on the model dam . according to the hydrodynamic pressure time history of the points , the distribution of hydrodynamic pressure along the dam is determined 在坝面上布置测点,取得测点的动水压力时程分布和沿坝面的分布。 |
| 10. | ( 5 ) lowing down the dam body will reduce the digging deep of the stilling basin , decrease the velocity of flow on the dam body and cut the difficulties of 但下游河床的冲刷加大,防护工作增加。降低坝体可以减小消力池的挖深,降低坝面流速和坝面的防护难度。 |