| 1. | Study on the mechanism of ground collapse in beiminghe iron mine 北?河铁矿地表塌陷机理研究 |
| 2. | Analysis of ground subsidence caused by metro tunnel excavation 地铁隧道开挖引起地表塌陷分析 |
| 3. | Preliminary study of reasons causing surface subsidence in beiminghe iron ore mine 北?河铁矿地表塌陷原因初探 |
| 4. | Discussion on treatment of surface collapse and ecological destruction in coal mine 煤矿地表塌陷生态破坏的治理探讨 |
| 5. | Post grouting for hand dug piles with the pipe driven at the pile end 静压注浆与旋喷桩在岩溶矿床地表塌陷治理中的应用 |
| 6. | Monitoring technique for mining subsidence with digital terrestrial photogrammetry 矿山地表塌陷区的数字近景摄影测量监测技术 |
| 7. | Finite prism element method of ground subsidence calculation and 3d data model based on gis 地表塌陷计算的有限棱柱法及三维数据模型 |
| 8. | Discussion on mechanism of surface collapse pit and dimensions of obstructive ridge for steep inclined coal seam mining 急倾斜煤层开采地表塌陷坑形成机理与安全矿柱尺寸研究 |
| 9. | The ground collapse and cracks caused by underground mining severely threaten the safe in production and destroy the surface environment 摘要地下采矿引起的地表塌陷和裂缝,严重威胁矿山生产安全,破坏地表生态环境。 |
| 10. | The analyses show that the ground collapse is caused by underground mining together with the factor induced by mining in beiminghe iorn mine 分析结果表明,北?河铁矿地表塌陷是地下开采及其诱发的众多因素共同作用的结果。 |