| 1. | Site formation plan 地盘平整工程图则 |
| 2. | Site formation works 地盘平整工程 |
| 3. | Application form for certificates of exemption in respect of building , site formation drainage works 建筑工程地盘平整工程及渠务工程豁免证明书申请表格 |
| 4. | Any other requirements under the certificates of exemption for building works , drainage works and site formation works are complied with 符合建筑工程、渠务工程及地盘平整工程豁免证明书内任何其他规定 |
| 5. | Construction of the north - eastern riverwall and site formation work adjacent to lung tin estate in tai o were substantially completed in july 大澳龙田?毗邻的东北河堤建造工程及地盘平整工程,已于二零零二年七月大致完成。 |
| 6. | A small quantity of demolition waste , non - inert waste generated from site formation , municipal waste generated by site staff and chemical waste will be generated during the construction phase 施工期间只有少量由地盘平整工程而来的拆卸废料非惰性废料工地员工产生的生活废料和化学废料。 |
| 7. | A former graduate engineer and a former apprentice of a construction firm were charged for their alleged involvement in substandard works at a site formation project in sau mau ping 一名建筑公司的前见习工程师及另一名前学徒,涉嫌在秀茂坪进行一项地盘平整工程时偷工减料,被廉署落起诉。 |
| 8. | A former assistant engineer was jailed for two years and nine months for substandard works at a site formation project at a slope which subsequently collapsed during the rainy season in 1998 一名前助理工程师,在一项斜坡地盘平整工程中偷工减料,被判入狱两年零九个月。该幅斜坡其后于一九九八年的雨季倒塌。 |
| 9. | According to the current schedule , the detailed design for the centennial campus will be finalised in 2006 2007 . site formation work will commence at the end of the year and construction will begin in 2008 按现时的时间表,百周年校园的详细设计可于2006至2007年完成,地盘平整工程可于年底展开,而建筑工程将于2008年开始。 |
| 10. | Items in or on buildings , on podiums and rooftops , in yards and lanes including unauthorised site formation works constituting a serious hazard or a serious environmental nuisance , as determined by the building authority 位于楼宇内外平台天台天井或后巷而被建筑事务监督列为严重危害健康或对环境造成滋扰的僭建物包括违例地盘平整工程 |