| 1. | On the choice of capacity of voltage transformer in residential districts 住宅小区变压器容量的选择问题 |
| 2. | Construction content : electric power construction - 3 sets of transformer capacity 工程内容:电力工程变压器容量1500kva 3台 |
| 3. | Note : 1 、 users with transformer capacity above 100kva should apply interest rate adjustment charge system : power charge + interest rate adjustment charge 说明: 1 、变压器容量在100kva以上的用户应执行利率调整电费:电量电费+利率调整电费。 |
| 4. | Industrial users with transformer capacity above 315kva should apply double charge system : basic charge + power charge + interest rate adjustment charge 变压器容量在315kva以上的工业生产用户应执行两步制电价:基本电费+电量电费+利率调整电费。 |
| 5. | The basic principle of earthing transformer is analysed . a proper capacity calculation method for earthing transformer is introduced . the calculation example is given too 分析了接地变压器的基本原理,介绍了一种比较合理的接地变压器容量计算方法,并给出了计算实例。 |
| 6. | Standard transformer can only operate at the rating capacity without the cooling fan , while each transformer may be installed with an extra cooling fan to increase the output capacity 每台产品上均可加装风机增大变压器容量输出,不装风机的变压器能在额定容量下连续运行。 |
| 7. | In large - scale new dry process cement production line , there are many trasformers and the capacitance is hurge , and the wastage cost can not be ignored and rest with the design scheme 摘要大型新型干法线中变压器容量大、数量多,其损耗成本不可忽视,且取决于设计时的方案选择。 |
| 8. | Under the condition of meeting the power supply requirement , the relationship is analyzed between the traction transformer capacity and voltage loss of variant parts as well as the short - circuit capacity of the power system 在满足供电要求的情况下,计算分析了牵引变压器容量与各部分电压损失、电力系统短路容量的关系。 |
| 9. | Electricity and pneumatic construction - with 15000kw generator capacity , 4 units , with transformer capacity 18525kva , total 14 units , water discharge - supply construction , weak electricity construction , monitor construction , and air system construction - total 1060rt 电气工程发电机容量1500kw 4台变压器容量19525kva共14台给排水工程弱电工程监控工程空调工程共1060 rt |
| 10. | Electricity and pneumatic construction - with 15000kw generator capacity , 4 units , with transformer capacity 18525kva , total 14 units , water discharge - supply construction , weak electricity construction , monitor construction , and air system construction - total 1060rt 电气工程发电机容量1500kw 4台、变压器容量19525kva共14台、给排水工程、弱电工程、监控工程、空调工程共1060rt |