English translation for "发电效益"
|
- power benefit
Related Translations:
岩浆发电: magma power generation 发电设备: electric power-generating equipmentgenerating machinerygenerating plantgenerating setgenerating unitgeneratingplantgeneration setgenerator pistonpower equipmentpower generating equipmentpo 发电调度: power generation dispatching 蒸汽发电: steam electric power generationsteam-electric power
- Example Sentences:
| 1. | In order to increase generating electricity benefit , the powerstation would like to excavate downstream channel 为了增加发电效益,拟对下游河道进行清挖处理。 | | 2. | The results show that the optimal cooperation operation will have the hydropower station of shiquan and xihe river more efficiency of electric power generation 结果表明,石泉、喜河水电站联合优化调度能获得更大的发电效益。 | | 3. | In order to promote the integrated efficiency of electric power generation of both stations , this thesis demonstrates the study on cooperating operation of the two - hydropower stations of cascade 为了提高两座电站的发电效益,论文对石泉、喜河两个梯级电站进行联合优化调度研究。 | | 4. | By studying factor of short - term optimization dispatching of cascaded hydropower , summarized regularity of short - term optimization dispatching of cascaded hydropower and inner - plant economical operation 实现了在电厂经济运行的基础上来实现整个梯级电站的优化运行,达到增加发电效益的目的。 | | 5. | The concept of energy - saving benefit of load management is proposed , and the energy - saving benefit is decomposed into generation benefit , distribution and transformation benefit , and line loss benefit , and relevant analysis methods are given 摘要提出了负荷管理节能效益的概念,将节能效益分解为发电效益、配变电效益和线损效益,并给出相应的分析思路和分析流程。 | | 6. | ( 3 ) according to compensation benefit formation cause and scientific , rational , impartial , equitable distribution principle , put forward distribution project of water supply and generation electricity compensation benefit in the main stream of the yellow river ( 3 )根据补偿效益成因分析及科学、合理、公平、公正的分配原则,提出黄河干流梯级水电站补偿效益中的供水和发电效益的初步分配方案。 | | 7. | Because the cascaded flow - thought delay time . daily power benefit has affected not only by previous day but by next day , daily power benefit is composed of " plant day " part and " effect day " part . based on the theory analysis , author developed a program what can well describes the cascaded reservoir short - term optimistic dispatch system model 由于梯级水流滞时的存在,日发电效益既受前日影响,也影响次日,为考虑水流滞后带来的影响,将日发电效益视为两部分组成: “计划日”部分和“影响日”部分。 | | 8. | This thesis analyses from following angles why speeding hydroelectric power exploitation is necessary for social and economic sustainable development of sichuan province : first , structure of power and resource of sichuan province requires accelerating hydroelectric power exploitation ; second , abundant water resource is advantageous for sichuan accelerating hydroelectric power exploitation ; third , comprehensive benefit results from hydroelectric power projects demands accelerating hydroelectric power exploitation ; forth , hydroelectric power exploitation stimulates development of other crafts ; fifth , construction of large scale project is beneficial for reducing resource cost of the whole society ; last , the process of hydroelectric power exploitation usually consists of much scientific and technological content 本文从下述几个方面分析了大力发展水电是四川社会和经济可持续发展的必然选择:四川的能源资源结构要求大力开发水电;四川水能资源的优势要求大力开发水电;水电工程巨大的综合经济利用效益要求大力开发水电,水电工程除了发电效益外,一般还兼有防洪、灌溉、供水、航运、养殖、旅游等社会效益,水电站的综合利用可以为社会创造巨大的社会和经济效益,造福一方;水电开发对经济广泛的拉动作用要求大力开发水电;大型水电建设有利于降低全社会资源损耗;水能资源的开发利用过程具有较高的科技含量。 | | 9. | The paper analyzes and researches the operation modes in the initial operation period of letan hydropower station and under the conditions of normal operation , on the premise of ensuring pivotal project and units to be safe and stable , the modes call hydropower station into full play in the systems and improve power benefit 摘要对乐滩水电站初期及正常运行情况下的运行方式进行分析研究,使其运行方式在确保枢纽工程和机组的安全、稳定的前提下,充分发挥电站在系统中的作用,提高发电效益。 | | 10. | Quantity of generating electricity should be also calculated while the river inflow , quantity of water transfer and its duration curve are taken into account . as a company , it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly . the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy , to decrease surplus water , and to increase seasonal electricity energy , ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits , iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits 在进行以上四方面内容深入探讨的基础上,论文针对丹江口水利枢纽运行任务、运行方式的重大变化,提出汉江集团应采取以下因应措施以适应企业产业结构的调整,这些措施包括:准确计算发电效益减少值;合理地核算水源的供水成本;以上述两项计算成果为基础,核算企业结构调整后总效益变化量;提高预报水平,减少弃水量,争取增发季节性电能;研究新的调度方式,提高电站调峰能力,提高电站的容量效益;在适当的地点修建抽水蓄能电站,提高电站的调峰能力。 |
- Similar Words:
- "发电替代方案" English translation, "发电脱盐联合装置" English translation, "发电系统" English translation, "发电细胞" English translation, "发电效率" English translation, "发电循环效率" English translation, "发电引水渠" English translation, "发电用发动机" English translation, "发电用汽轮机" English translation, "发电用燃料" English translation
|
|
|