English translation for "勘测资料"
|
- exploration data
Related Translations:
勘测: survey; reconnaissance 短语和例子地质勘测 geological survey; 地形勘测 topographical survey; 勘测报告 survey report; 勘测队 survey party; 勘测图 exploration map; 勘测者 cruiser 勘测航线: reconnaissance strip 地质勘测: geologic examinationgeological examinationgeological explorationgeological research 勘测报告: reconnaissance reportsurvey report 辐射能勘测: radiation survival
- Example Sentences:
| 1. | Technical rule of data processing for investigation of geotechnical engineering for fossil fuel power plants 火力发电厂岩土工程勘测资料整编技术规定 | | 2. | It is demonstrated by geologic survey data that the bearing capability and deformation of natural foundation are out of the scope of the required values , which means the natural foundation has to be treated 地质勘测资料表明天然地基不能满足油罐设计的承载力与变形要求,必须进行处理。本论文选题密切结合这项大型工程建设项目。 | | 3. | According to the characteristic transformation of the eme in the process of its deformation , the stress concentration belt engendered by the coal wedge of the protective coat can be ascertained and the electromagnetic radiation measured result is consistence with the calculation result of the site survey materials 根据煤体变形破裂过程中产生的电磁辐射信号特征变化,确定了保护层采空区煤柱产生的应力集中带,电磁辐射测定结果与现场勘测资料计算结果相吻合。 | | 4. | As water and electricity engineering reconnaissance has the characters of long period of prophase work , many reconnaissance data , heavy information , complex technology . in addition , its criterion and standard is still being improved and perfected . implementing engineering construction infomationization is the base of scientizing and modernizing the engineering construction 由于水电工程勘测工作具有前期工作时间长、勘测资料多、信息量大、技术问题复杂等特殊性,另外,水电工程勘测的规程规范和标准尚在不断的改进和完善,因此实现工程施工信息化是实现工程施工科学化和现代化的基础。 | | 5. | Correlative function method and variable function method are used to calculate the relevant range of soil layer . the limit capacity of bored pile is determined by the cone penetration tests ( cpt ) and the static loading tests and related statistics parameters are also evaluated . considering the effects of group piles , the action effect is calculated by the settlement of pile foundation and the reliability index of single pile as well as group piles is determined by monte - carlo method 本文选择临近场地的四座高层建筑地基的全部勘测资料,以沿深度方向的一维平稳高斯随机场作为桩基土层土性参数的数学模型,利用相关函数法和变异函数法计算土层的相关范围,由cpt和静载试验结果综合确定钻孔灌注桩的极限承载力,进而对相同场地各试桩的承载力进行折算后检验其概率分布,并估计有关统计参数:考虑群桩效应确定桩基承载力,由桩基沉降反算其作用效应,由monte - carlo方法计算单桩及群桩的可靠指标。 |
- Similar Words:
- "勘测选点" English translation, "勘测与修葺周期" English translation, "勘测者" English translation, "勘测者五号" English translation, "勘测指导书" English translation, "勘查" English translation, "勘查程度" English translation, "勘查船" English translation, "勘查地球化学" English translation, "勘查费" English translation
|
|
|