| 1. | Design standards of hydropower headrace and forebay 水电站引水渠道及前池设计规范 |
| 2. | Design specifications for hydropower headrace and forebay 水电站引水渠道及前池设计规范 |
| 3. | Numerical simulation of sill flows in the forebay of pumping station 泵站前池底坝整流数值模拟研究 |
| 4. | Counter messures of improving conditons of the pump station front pond 改善泵站前池运行工况的措施 |
| 5. | Strengthening measures for forebay of xinhekou pumping station and their effect 新河口泵站前池加固措施及其效果 |
| 6. | Numerical simulation of flow patten in the front inflow forebay of pumping station 泵站正向进水前池流态的数值模拟 |
| 7. | Test research of diversion water channel and front tank of number 2 middle - line sewage pump station in shanghai 上海中线2号污水泵站引水渠道和前池的试验研究 |
| 8. | Rcc casting & backfilling work for cw pump house is in progress . excavation forcw channel was stared on april 2 循环水泵房正在浇筑池壁混凝土和基础回填,前池于本月2日开挖,开挖工作正在进行 |
| 9. | In the past few years , he says , a sandy bottom has given way to green gunk and his visitors refuse to swim in it anymore 他说在几年前池底已经布满了绿色的油腻物质,他的客人再也不在里面游泳了。 |
| 10. | The results show that the water - level controlling system has wide stable domain and stable condition is easy satisfied and the domain is larger when the forebay time constant tq is bigger 分析表明,水位调节模式下调节系统的稳定条件容易满足,稳定域很大,前池时间常数t _ q大的更有利于调节系统稳定。 |