| 1. | Reason analysis and treatment for tunnel cracks 关于隧道二次衬砌砼裂缝 |
| 2. | Numerical analysis of secondary lining in double - arch tunnel 双连拱隧道二次衬砌施工数值分析 |
| 3. | Evaluation of the effect of collapse in top area of a double - arched tunnel on its the secondary lining 双连拱隧道洞顶坍方对二次衬砌稳定影响评价 |
| 4. | Analysis of the interaction between primary support and the secend linning of large span and double arch tunnel 大跨连拱隧道初期支护与二次衬砌相互作用分析 |
| 5. | In this thesis , the measure method for spray concrete and concrete lining was explained shortly and sweetly 本文简要介绍了隧道喷混凝土和二次衬砌的检测方法。 |
| 6. | So it is necessary that the intensity of spray concrete and concrete lining is examined and measured on the locale 因此,对喷射混凝土和二次衬砌的强度进行现场检测是十分必要的。 |
| 7. | Optimized techniques for fabricating the secondary lining of a two - storey shallow subway station with single arch and one row of columns excavated by mining method 单拱单柱双层浅埋暗挖地铁车站二次衬砌优化施工技术 |
| 8. | After pass through analyze a lot of fact checking data , tunnel lining concrete thickness require could express by probability statistic 在经过对大量的检测数据的分析后,隧道二次衬砌厚度的检测要求可采用数理统计方法表达。 |
| 9. | Bases research of by bore - exploding way built tunnel , discover the tunnel lining thickness and tunnel lining inner figure accord with normal school 根据研究发现在钻爆法修筑的隧道中,隧道二次衬砌混凝土结构的衬砌厚度和内轮廓的统计规律符合正态分布。 |
| 10. | Model board trolley is a non - standard large mechanical equipment for tunnel construction , its main frame is a plate and beam element constructed steel structure 模板台车是隧道施工中二次衬砌用的一种大型非标机械设备,其主体结构是板梁结合的钢结构。 |