| 1. | Dalian world bank loan office 大连市世界银行贷款项目办公室 |
| 2. | Some thoughts about purchase of book materials by use of the world bank loan 从世界银行贷款图书资料采购想起的 |
| 3. | Discussion on procedures of design modifications of the world bank financed projects 浅议世界银行贷款项目的设计变更程序 |
| 4. | The world bank loan has a maturity of 20 years , including a five - year grace period 世界银行贷款期限20年,其中包括5年的宽限期。 |
| 5. | Study on finance management of resettlement fund at basic level in xiaolangdi reservoir project 小浪底移民项目利用世界银行贷款的实践与体会 |
| 6. | Analysis on the implementation results of world bank loaned tb control project in shijiazhuang 石家庄市实施世界银行贷款中国结核病控制项目效果分析 |
| 7. | In 1995 , dalian government decided to rehabilitate the chunliuhe wastewater disposal factory by loaning from world bank 1995年,大连市政府决定利用世界银行贷款对春柳河污水处理厂进行改造。 |
| 8. | Analysis and evaluation of effects of hunan provincial tuberculosis control project loaned by the world bank during the past ten years 2001年湖南省世界银行贷款结核病控制项目实施效果分析与评价 |
| 9. | Sponsored the projects using world bank loan on behalf of the provincial department , and some of the projects got the approval from the national planning committee in 1989 - 1991 代表省轻工业主管部门主谈轻工行业利用世界银行贷款项目,其中部分项目得到了国家计委的认可和批准。 |
| 10. | Editedthe bid documents of the world bank financed projects as consolidation of soutlern oides of luoma lake and the monitoring and contrd system for the grand chanal 编制了利用世界银行贷款项目- -骆马湖南堤加固工程国内竞争性招标文件,江苏省大运河监调系统工程国际竞争性招标文件。 |