| 1. | A research over substructure design for jinbin light rail viaduct with jointless track 采用无缝线路的津滨轻轨高架桥梁下部结构设计研究 |
| 2. | The lower structures even had not been yielded as the upper structures were destroyed 上部结构趋于破坏时,大平台下部结构尚未有明显屈服的现象。 |
| 3. | Usually , it is accustomed to name the bridge stride as the substructure of bridge 通常习惯称桥跨为桥梁的上部结构;称桥墩,桥台及其基础为桥梁的下部结构。 |
| 4. | Based on calculation and analysis of b8 bridge pile cluster foundation , upper and lower structure configuration can be adjusted 摘要通过对b8桥群桩基础的布置、计算及分析,提出下部结构要和上部结构相协调的观点。 |
| 5. | At the mean time , discussion about selecting the transfer story ' s number of upper and lower floor in local analysis is performed 还对进行钢桁架转换层局部详细受力分析时,其上、下部结构层数的选取进行了探讨。 |
| 6. | Furthermore , geometrical sizes of superstructures are easier to perform . 2 . the prefabrication of superstructure segments can be processed while the substructure is under construction ( 2 )施工速度快,工期短;上部结构节段预制可与下部结构施工同时进行。 |
| 7. | Refering to the vertical loads on the slab , the paper analyzes the effects from under parts and present a comparative reasonable support pattern 在讨论厚板转换层在竖向荷载下的受力时,主要分析了下部结构对厚板的影响,以期使用一种最为合理的支座模型模拟实际情况。 |
| 8. | Other items may also include medical gas , computer infrastructure , phone / communications systems , and life safety systems such as fire alarms or fire suppression systems 其他项目可会包括医学气体,计算机下部结构,电话/通讯系统和生活安全系统,比如:火警和扑火装备系统。 |
| 9. | This paper analyzes the influence of pile spacing , pile diameter and pier cross - section on the stiffness of bridge foundation through the calculation of the longitudinal stiffness at pier - top 摘要对桥墩纵向刚度进行计算,分析影响桥梁下部结构刚度的主要因素,包括桩径、桩间距以及墩截面几何尺寸。 |
| 10. | The plastic hinges occurred at the bottom and top of the columns of the platform , while there were no plastic hinges at the ends of transfer beams though the bars there were yielded 下部结构一层梁首先屈服,继而大平台柱的底部和顶端都形成塑性铰,转换梁上的钢筋虽然也有屈服,但是没有明显破坏现象。 |