In fact mbo corrects the defection causable of the excessive agency cost Mbo实际上是对过度分权导致代理成本过大的一种矫正。
2.
Construction of a mass concrete is in the construction process , because of cement let out in large quantity hydration heat and surface of a mass concrete let out heat , make its temperature , humidity cause to ascend and descend , and it causable constringency transform will be unavoidable 大体积混凝土结构在施工过程中,由于混凝土中水泥熟化时放出大量的水化热及其随后的表面散热,使其温度、湿度出现升降变化,并由此而引起的收缩变形将是无法避免的。
3.
In education institutional arrangements of the construction process , exist different types of changing paths : change from the latent opportunity of an education institution for causing improvements of the efficiency ; be competed by exterior pressures ; the causable education institution changes due to the thought idea inside with target self - contradiction ; the causable education institution changes due to ultimate end value in mankind in institutional result violation 在教育制度安排的建构过程中,存在四种不同类型的教育制度变迁的路径:由改进效率的潜在机会所引起的教育制度变迁;由外部竞争压力引起的教育制度变迁;因思想观念中手段与目标之间的矛盾而引起的教育制度变迁;因制度的结果违背人类终极价值而引起的教育制度变迁。
4.
This text the standard of the nation 《 the public construction engineering indoor environment pollution control norm 》 ( gb50325 - 2001 ) the source and banes of the indoor pollutant of the control made the analysis and studies , and for put forward the design , construction from the control that the adornment repairs the causable indoor environment pollutant etc . prevention and cure measure 本文就国家标准《民用建筑工程室内环境污染控制规范》 ( gb50325 - 2001 )控制的室内污染物的来源及危害作了分析与探讨,并为由装饰装修引起的室内环境污染物的控制提出了设计、施工等工程防治措施。