| 1. | Improve the quality of as - built documents of railway projects 铁路竣工文件编制中存在的问题及对策 |
| 2. | The quality of the as - built software 生成软件的质量。 |
| 3. | How to improve the quality of as - built document of capital construction 如何提高基建工程竣工文件的案卷质量 |
| 4. | As - built schedule 实际建造进度计划 |
| 5. | As - built design 实际建造设计 |
| 6. | Discuss about constitution preparation of as - built drawings and documentation for railway projects 论述铁路工程竣工文件的形成与编制 |
| 7. | Preparing shop and construction coordination drawings and final record " as - built " documentation 准备加工图和施工协调图纸以及作为最终记录的“竣工”文件。 |
| 8. | To manage that the all relevant test documents and as - built documents are provided by all project partners on time 确保项目伙伴及时提交所有测试相关的文档和竣工文件。 |
| 9. | Sectional requirements for electronics manufacturing supply chain communication of as - built product data - product data exchange 电子仪器制造组合态产品数据供应链通信系统的分要求.产品数据交换 |
| 10. | Phase 1 installation qualification , as - built testing , or construction approval . this is testing that proves the environment was correctly installed and that it meets the intended design specifications 第一阶段,安装合格验证,竣工测试,或建造审核。该项测试用以证明环境已正确实现,符合既定设计要求。 |