修改设计 meaning in Chinese
revised a design
revised design
Examples
- At the same time , there exist the following problems : long design cycle , high error rate , large amount of repetitive modifying , lack of information share , etc . therefore , it is of great practical significance to develop one cad and software to solve the problems above and to be acceptable to the shapes and structure features of solid door
实木门的造型比较复杂,款式变化多,在设计过程中存在设计周期长,出错率高,重复修改设计工作量大以及缺乏信息共享等问题,是家具设计中的瓶颈。因此研究开发适合实木门的造型和结构特点、能够解决上述问题的实木门计算机辅助设计方法和软件具有重要的实用价值。 - Design for production includes design guidelines , capacity analysis , and estimate manufacturing cycle time . it determines manufacturing a new product design affects the performance of the manufacturing system . in this paper , a general dfp approach which can reduce manufacturing cycle time during product design is presented
该方法通过制造系统生产能力分析和新产品制造周期估算,可以分析反馈影响产品制造周期和制造系统性能的问题信息,通过及时修改设计,从而缩短产品开发周期。 - In order to further optimize structure of the valve , the design need engineering analysis , and need feedback information of performance parameter in experiment to modify design . because of limited time , this paper establishes stress distribution and deform only by fea , and optimizes the structure of valve . it can ensure the valve meet the requirement of fact usage and assembly , and found good base for further research and experiment on body or out - of body and manufacture on large scale
为了进一步对瓣环和瓣叶作结构优化,设计还需要进行工程分析,还需要将实验获取的性能参数信息反馈回来,修改设计,由于时间关系本论文仅用有限元分析确定人工心瓣在工作及装配时的应力分布和变形情况,对瓣环和瓣叶的结构进行优化,以确保设计出来的人工心瓣满足实际使用和装配要求,为人工心瓣的进一步研究、进行离体和在体实验及批量生产奠定良好的基础。 - Where in the course of survey or design , any repeating work , work stoppage or change of design occurs due to the developer ' s change of plan , the incorrect information provided by it , or its failure to provide the working conditions necessary for the survey or design at the prescribed time , the developer shall increase the fees in light of the actual amount of work done by the surveyor or designer
第二百八十五条因发包人变更计划,提供的资料不准确,或者未按照期限提供必需的勘察、设计工作条件而造成勘察、设计的返工、停工或者修改设计,发包人应当按照勘察人、设计人实际消耗的工作量增付费用。 - During the design and strength calculating of ship structure , the process " preliminary design - modeling - analysis - revision - re - design - re - modeling - re - analysis " will be carried out repeatedly , and there are some defects in the apply of fea soft , such as the preprocessor and the postprocessor of these fea soft are operated complex , the requirement to users is too much , and the user be apt to make mistake during the processing
在船舶结构设计和结构强度的校核过程中,往往需要反复进行“设计?建模?分析?修改设计?再建模?再分析”的过程,但当前有限元分析软件系统都存在前后处理过程复杂、烦琐、易出错、费时费力、对软件使用者要求高等问题。