Chinese translation for "underwater concrete"
|
- 水底混凝土
水下混凝土 水下浇铸混凝土
Related Translations:
- Example Sentences:
| 1. | Test code on non - dispersible underwater concrete 水下不分散混凝土试验规程 | | 2. | The technological control of underwater concrete grouting of pile foundation 桩基础水下混凝土灌注的技术控制 | | 3. | An experimental study on the type zj - 1 admixture for non - dispensed underwater concrete 1型水下不分散混凝土外加剂的试验研究 | | 4. | Analysis on usual accidents in underwater concrete pouring and its countermeasures 水下混凝土灌注常见事故分析及处理措施探讨 | | 5. | Combining theory with practice , in this thesis , i analyses the content of the construction of steel round the barrage . such as , the structure of steel round the barrage , the arrangement of mooring , the calculation of mooring chain , the manufacture and assembling of steel round the barrage , the moving up connection and sinking of it , confining the bottom of underwater concrete 本文结合实际工程,详细分析了钢围堰的构造、锚锭系统的布设、锚缆的计算、钢围堰的制作及组拼、钢围堰的接高与下沉、水下混凝土封底等围堰施工的重要内容;并对常用的钢套箱施工技术进行了讨论。 | | 6. | Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement 文摘:水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。 | | 7. | The precautions for the underwater concrete reinforcing cage up - floating accident is placing the reinforcing cage in the pile hole center , controlling the embedded depth of conduct pile , concrete casting velocity and conduce pipe drawing velocity , mixing fine quality concrete , adding barbed bar and specialized refincing cage hanger hook 采用对策是注意保证灌注导管位于钢筋笼中心,控制导管埋深、灌注速度及提升导管的速度,配制品质好的混凝土,以及采用“倒剌”方法和专用吊钩等预防措施。 | | 8. | The cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement 水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。 |
- Similar Words:
- "underwater communication system" Chinese translation, "underwater communications system" Chinese translation, "underwater compa" Chinese translation, "underwater compass" Chinese translation, "underwater completion" Chinese translation, "underwater concrete mix" Chinese translation, "underwater concreting" Chinese translation, "underwater connection" Chinese translation, "underwater connector" Chinese translation, "underwater construction" Chinese translation
|
|
|