Chinese translation for "steel pipe pile"
|
- 钢管杆
钢管桩
Related Translations:
piling: n.1.打桩,打桩工程。2.桩,桩基;桩材。
- Example Sentences:
| 1. | Design of steel pipe pile project in sudan oilfield 苏丹油田钢管桩工程设计 | | 2. | Standard specification for welded and seamless steel pipe piles 焊接钢和无缝钢管桩的标准规范 | | 3. | Spiral - weld steel pipe pile 螺旋电焊钢管桩 | | 4. | Applicationof steel pipe pile and bridge framework construction kickstandin the construction of cast - in - place box beam 对连续弯梁桥空间转角近似计算方法的探讨 | | 5. | According to the special atmospheric and geologic conditions in sudan oilfield , steel pipe pile is the preferred basement of oilfield equipment basement 摘要根据苏丹油田的气候和地质条件,选定其油田设备基础为钢管桩基础。 | | 6. | The authors suggested porous plate at the pit bottom , together with slope anchorage net and steel pipe piles to strengthen the foundation 本文提出了采用粉喷桩多孔板暗撑加固抗隆起技术,与边坡喷锚网、钢管桩联合支护结构相结合。 | | 7. | The main technique measures for the design and construction of steel pipe pile are confirmed based on the calculation of vertical and horizontal bearing capacity 通过计算钢管桩的垂直承载力和水平承载力,确定了钢管桩工程设计施工的主要技术措施。 | | 8. | This machine is available to driver different kinds of piles , such as prefabricated concrete piles , steel pipe piles , steelplate piles , etc . it is a convenient machine for construction of building , bridge , port 本桩架适用于打植混凝土预制桩、钢管桩、钢板桩,是建筑、桥梁、港口施工中机动灵活的桩工施工机械。 | | 9. | In which , it gives inquiring of the construction of deep - water foundations and the usage of floating crane . the construction program of bridge pier foundation will be fixed according to the water depth . if the water depth is less than 4m , pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed , at the same time , it has sufficient bearing capacity to load steel pipe pile , the steel pipe pile platform will be adopted 其中,对深水基础的施工及浮吊的使用进行了探讨,根据水深确定桥墩基础的施工方法,对水深不超过四米的桥墩基础,采用填土筑岛的方法:对水深大于四米,河床有覆盖层,且能保证钢管桩具有足够的承载力的桥墩,采用钢管桩平台;对主河道上河床没有覆盖层,钢管桩无法插打的桥墩,采用浮式平台。 | | 10. | If there is no over burden at the river bed , the steel pipe pile cannot be inserted , the floating platform will be adopted , during overwater construction , the author ( using zhong - 60 floating box , etc . ) assembled 40t floating crane by his own design , in this way , the floating crane completed the work of overwater transporting and lifting , such as the transporting of s teel pipe pile , inserting , the erecting of overwater construction platform , overwater moving of drill grid crane , lifting of lifting box of cushion cap , pulling out of steel pipe pile 在水上作业中,作者利用中- 60浮箱等设备自行设计、拼制了40t浮吊,完成了水上运输、水上起重等作业,如钢管桩的运输、插打、水上施工平台的搭设、钻机吊车的水上转移、承台吊箱的起吊、钢管桩的拔除等作业。 |
- Similar Words:
- "steel pipe fittings" Chinese translation, "steel pipe fittings for flanged joint" Chinese translation, "steel pipe flange" Chinese translation, "steel pipe flanges" Chinese translation, "steel pipe handrailing" Chinese translation, "steel pipe pile dolphine" Chinese translation, "steel pipe plate" Chinese translation, "steel pipe railing" Chinese translation, "steel pipe reinforced concrete structure" Chinese translation, "steel pipe scaffold" Chinese translation
|
|
|