Mobile
Log In Sign Up
Home > english-chinese > "rebuild project" in Chinese

Chinese translation for "rebuild project"

翻修工程

Related Translations:
rebuild:  vt.(-built ) 再建,重建;使复原;改建;改造;改变。vi.重建。
rebuilt:  重建
rebuilding:  改建
minimal rebuild:  最少重建
rebuild iraq:  重建伊拉克
rebuild curve:  重建曲线
rebuild kit:  修复机器用的成套零部件
earlap rebuild:  耳垂重建
rebuilding allowance:  重建免税额
nose rebuild:  鼻再造
Example Sentences:
1.7 . electric survey for the rebuilding project of donghu pump station
7 .东湖泵站改造工程电法勘探
2.Quality supervision of cement stabilized gravel base in rebuilding project of shen da highway
沈大路改扩建工程水泥稳定碎石基层质量监理
3.In design of folk - custom scene street , o rebuild project of nantang street in wenzhou , this new mode was attempted
在温州南塘街改建工程民俗风貌街设计项目中,我们对这种新模式进行了尝试。
4.Relying on the rebuilding project in wu - huang highway , the author analyzes the structural property of the pavement with strata , the mix design and construction technology of strata
依托武黄公路改建项目,分析了strata应力吸收层路面结构性能, strata材料配合比及施工技术。
5.After analyzing the questions of technics , equipment and product configuration to raw slime water in changcun coal cleaning plant , dissertate the confirm gist of rebuild project and the effect after actualizing the project in technology and economy
摘要在详细分析了常村矿选煤厂原煤泥水系统在工艺、设备和产品结构存在的问题后,重点论述了改造方案的确定依据和改造方案实施后在技术、经济方面取得效果。
6.To decide the process and factors affected runoff and the characteristic of water erosion of large dump which produced during construction of railway engineering , study of natural rainfall for hezhuang dump in beitongpu railway rebuilding project is made during raining season
摘要以北同蒲增建二线改造工程河庄弃土场作为研究对象,在雨季进行了天然降雨试验研究,确定了项目建设产生的弃土场区域内产流过程及影响因素和土壤侵蚀特征。
7.Depend on the precise blast design with small error and strictly controlling the explosive consumption , they controll blasting construction for rock availably , complete the excavation for rock cuttings of broaden and rebuilding project for city roads successfully , and obtain well social benefit and economical benefit
通过续密的微差爆破设计,严格控制装药量,有效地控制了岩石爆破施工,成功地完成了城市道路拓宽工程的岩石路堑边坡开挖工程。
8.This thesis is based on the author ' s work in the network - rebuilding project of the comprehensive business system ( cbs ) of the agricultural development bank of china ( adbc ) . considering the already - running network conditions , and based on the security risk analyses and assessment , referring to the dynamic information security model , it frames out the sound network security policy for the cbs as well as the hierarchy security system according to the policy . with the in - phase built - in deployment of the network - rebuilding project for the cbs , the network security system has got good practical results
本文以作者在农发行综合业务系统网络建设中的具体工作为背景,根据信息系统安全体系结构的一般性原则,对农发行综合业务系统网络的安全风险进行了分析和评估,提出了构建安全平台的需求和综合业务系统的网络安全策略,建立了层次化的网络安全体系,设计了具体的技术方案和项目集成方案,该网络安全平台已伴随着综合业务系统网络改造项目的实施而同步进行嵌入式构建。
9.The problem of acid rain is still severity , in the fossil power plant , the flue gas desulfurization is the main approach on controlling the let of so2 . the paper mostly introduce the dcs rebuilding project of the desulfurization system in . the equipment is first introduced into our country from mitsubishi corporation , which is the wet limestone - gypsum flue gas desulfurization equipment
火电厂烟气脱硫是控制so _ 2排放的主要途径。本文主要介绍华能珞璜电厂脱硫系统的dcs改造工程。该装置是国内首家引进的日本三菱重工公司湿式石灰石石膏法烟气脱硫装置。
Similar Words:
"rebuild kit" Chinese translation, "rebuild livelihood" Chinese translation, "rebuild maintenance" Chinese translation, "rebuild one" Chinese translation, "rebuild proect" Chinese translation, "rebuild project (" Chinese translation, "rebuild surfaces" Chinese translation, "rebuild the republic" Chinese translation, "rebuild topology" Chinese translation, "rebuild traditional industry" Chinese translation