| 1. | Piling load test for bridge str 09a 为桥编号09a进行桩柱的承重测试 |
| 2. | Pile loading capacity of silt clay 粉质粘土中的桩承载性能分析 |
| 3. | Temporary staging for marine piling pile load test for socket h - piles 为海桩工程而建造的临时工作台 |
| 4. | Piling load test for bridge str 17 near the wsd catchwater 邻近于长沙引水道为桥编号17进行桩柱的承重测试 |
| 5. | Lateral pile load test 单桩横向载荷试验 |
| 6. | Pile load test 桩荷载测试 |
| 7. | An analysis on the nature of case method and on the cause of underestimated pile load capacity by this method 法的实质及承载力低估的原因探析 |
| 8. | An important engineering problem is how to determine the axial bearing capacity of mixing method by using the data of pile load test below limit load 摘要如何根据未压到破坏的试桩资料来确定水泥土搅拌桩极限承载力是一个重要的工程问题。 |
| 9. | According to different working performance ofjhe partially prestressed structure after cracking under the piling loads , the calculating formulae of the " complete stress " are deduced separately by means of linear - elastic or nonlinear analysis method 根据部分预应力构件在荷载分期作用下不同的受力性能,分别用线弹性方法和非线性分析方法推导了预应力构件开裂截面全应力的计算公式。 |
| 10. | The reliability and efficiency was tested by an actual example . in addition , factors such as the settlement in pile , pile loads and the stress in the foundation beam have also been analyzed . some conclusions and recommendations have been put forward 另外,本文还通过对桩?梁?地基土共同作用体系中荷载分担比、桩顶反力分布、桩沉降、承台内力及其影响因素等进行分析,得出了一些有益的结论和建议。 |