| 1. | Measure call completion time ( post dial delay ) 测量呼叫完成时间(拨号延迟之后) 。 |
| 2. | Scheduling to minimize the weighted sum of completion times 极小化加权完工时间和的调度问题 |
| 3. | Minimizing total completion time of orders with multiple job classes 崇明上实现代园区农业生态环境评价 |
| 4. | A commentary summary of studies on the completion time of er ya and its author 的成书时代和作者问题研究评述 |
| 5. | The arithmetic of the average completion time based on stochastic petri nets 网的产品任务平均完成时间算法研究 |
| 6. | Single - machine scheduling with maintenance to minimize the total weighted completion time 目标函数为加权完成时间和的单机维护调度问题研究 |
| 7. | Inverse scheduling problem on a single machine stochastic scheduling to minimize the total completion time 单台机器总完工时间随机排序问题的反问题 |
| 8. | Semi on - line scheduling problem for maximizing the minimum machine completion time on m identical machines 台同型机极大化最小机器负载的半在线问题 |
| 9. | Patients had a median of two blocks and the median completion time for the blocks was nine minutes 病人平均需要两次麻醉,麻醉的平均起效时间为9分钟。 |
| 10. | Task completion time in this domain is not a critical factor and the consumer is not under significant time pressure 任务完成时间不是一个关键因素,消费者没有很大的时间压力。 |