Developing the infrastructure construction in china by using the bot method 方式发展我国基础设施建设
2.
Research on the enforcement of bot method in the construction of china ' s infrastructure 融资方式在我国基础设施建设中的实施
3.
The kaohsiung mass rapid transit system made up of red and orange lines is now at a detailed planning and design stage using the bot method . it is planned to commence revenue services in six years . the kaohsiung port - rail kpr line is located at an inner orbital position on the kmrt network which will cross it in longitudinal and latitudinal directions 建议采用标准轨距,架空线供电之大部分低底板六轴联结式轻轨车辆,通车初期每列车以一至二辆编组营运,远期则采二至三辆编组,月台设计长度为90公尺,以付费证明系统收费,平面段采b