| 1. | Code ofr construction and acceptance of industrial boiler installation engineering 工业锅炉安装工程施工及验收规范 |
| 2. | Code for construction and acceptance of industrial boiler installation engineering 制冷设备空气分离设备安装工程施工及验收规范 |
| 3. | In many boiler installations , a valve smaller than pipe size could and should be selected 在许多锅炉安装场合,阀门通径可能甚至应该比管道直径小。 |
| 4. | Some issues relating to the quality control system in low - pressure boiler installation are analysed and discussed herein with measures for improvement given 论述了低压锅炉安装质量保证体系中存在的有关问题,进行了有针对性的分析论述,并提出了改进措施。 |
| 5. | Boiler installation contractor that has gotten the certificate shall be approved by safety supervision bureau for bpv ( ssbb ) that is responsible for supervising operation of the boiler and its level is equal to city before installing boiler 取得相应安装资格的锅炉安装单位,在锅炉安装前,应到锅炉设备使用地的地市级锅炉压力容器安全监察机构(以下简称安全监察机构)履行审批手续。 |
| 6. | The author uses the technique of generalized network plan and the key line methods to divide the boiler installation item and build configuration model , adopts the p3 in the building pingliang power plant project to realize the dynamic management of this installation plan , and give news of the project schedule , plan and material to the power plant by the computer network to help the manager 本文作者应用广义网络计划技术和关键线路法对锅炉安装项目进行作业划分和建立结构模型,并通过p3软件在平凉电厂在建工程中的应用,实现了安装工程计划的动态管理,并通过计算机网络向电厂发布电建工程的施工进度、计划、材料等方面的信息,为管理层提供了详实的管理数据。 |