Mobile
Log In Sign Up
Home > english-chinese > "项目投资管理" in Chinese

Chinese translation for "项目投资管理"

project investment management
Example Sentences:
1.Real option - the agility and strategy tool of project investment management
兼顾灵活性和战略性的项目投资管理工具
2.According to the highway requirement of building project investment and the principle of integration of theory with practice , the author manages to guide the practice of the transform project of tongliang - hechuan 2th road and carries out the appraisement research of economic integration including analysing the historic background and existing questions of this project , proposing the essentiality to upgrading and revising this road , analyzing the economic evaluating method of road , studying the investment evaluation and capital raising of tongliang - hechuan 2th road . at the same times , the author has carried through particular and systemic evaluation for the project and the result is feasible
基于上述认识,作者以公路工程改造建设为背景,进行深入的剖析,按照公路建设项目投资管理的要求,本着理论联系实际的原则,运用研究的理论指导铜梁合川二级公路改造项目的实践,对其进行综合经济评价研究,包括对铜梁合川二级公路的现状和存在问题进行说明分析、提出进行公路改造的必要性、公路交通经济评价理论分析、对铜梁合川二级公路的改造进行投资估算和资金筹措,并对该改建项目进行了详细而系统的经济评价,结论是可行的。
3.The cost engineer plays an important part in the program investment process , from the feasibility study stage , the design stage , the bidding and tendering stage , the construction stage , to the final accounting stage , the cost engineer should fix on the conceptual control purpose and measure of the program , take the step of beforehand control , in - hand control and after - hand control , in order to carry out the controlling of all the project process and direction
造价工程师在项目投资控制中具有重要的作用,从项目可行性阶段、设计阶段和招投标阶段、施工阶段到竣工结算阶段,造价工程师负担着确定项目控制目标和措施,采取事前控制、事中控制、事后控制的手段,实现对工程项目全过程、全方位控制。这是造价工程师在项目投资管理活动中所承担的责任。
4.By analyzing the phenomenon of " rush " of port construction around china and the influence of the gap between port capacity and their actual throughput , from the need to further develop the theory of port construction , this paper puts forward the idea of establishing early warning management system to the investment risk of regional port projects from such aspects as the purpose , object , procedure and sigificance of the study
摘要针对当前我国港口建设中出现的“过热”及全国范围港口吞吐能力不足的表象,从港口建设理论需要进一步完善的角度提出构建区域港口建设项目投资管理机制的设想,对开展区域港口建设项目投资风险预警管理研究的目的、对象、步骤以及开展研究的意义进行了归纳和总结。
Similar Words:
"项目投资程序:" Chinese translation, "项目投资的资金来源及融资方案分析" Chinese translation, "项目投资分析表" Chinese translation, "项目投资分析示例" Chinese translation, "项目投资风险" Chinese translation, "项目投资回收时间" Chinese translation, "项目投资决策:" Chinese translation, "项目投资可行性研究" Chinese translation, "项目投资时期" Chinese translation, "项目投资优度指标" Chinese translation