| 1. | The sussex ironworks were carried on at such a prodigious expense of wood . 苏塞克斯铁厂象这样办下去使木材造成如此惊人的耗费。 |
| 2. | Two iron works have been built in that area 在那个地方建立了两个铁厂。 |
| 3. | After optimisation of water - using network in an iron works , freshwater can be reduced by 57 . 7 % and wastewater by 75 . 9 % 改造后的铁厂用水网络新鲜水用量节约57 . 7 % ,废水排放量减少75 . 9 % 。 |
| 4. | The sideboard clearly has to be reworked to win this matchup , maybe even the maindeck to some extent 如果铁厂想要在这类对局中占得上风,那么很明显,它的备牌需要改动,甚至猪排的配置得改变一下。 |
| 5. | Process change method was used to improve water - using system in iron works for minimizing wastewater generation 摘要将过程改变法应用到铁厂用水系统改造中,对其用水网络进行调优,实现废水排放量最小化。 |
| 6. | Toxic sulfur dioxide and other pollutants billow into china ' s atmosphere from plants such as this coal - powered ironworks in pianguan 正如山西偏关的这个以煤作为电力的铁厂,有毒的二氧化硫气体和其他污染物不断的滚滚侵入中国的大气。 |
| 7. | Abstract : the conception and automatic control demand for raw materials field modification project of 2 ironmaking plant in tangshan i & amp; s co . were presented in this paper 文摘:介绍了唐钢二铁厂原料场改造设计的主要工艺特点及自动化控制要求。 |
| 8. | Hanyang iron works was the only rail - making enterprise in early modem china as well as the only representative of realizing heavy industrialization through introducing foreign modem iron and steel technology into china 摘要汉阳铁厂是我国近代唯一的钢轨制造企业,也是我国以现代钢铁技术引进来实现重工业化早期的唯一代表。 |
| 9. | Maintenance station s construction duration is from july , 2003 to sept . 2005 . after its completion , yan - chao maintenance factory can function smoothly , and it will make the high speed railway system safer , reliable , more comfortable and more convenient 总铁厂之施工期为92年7月到94年9月,待完工燕巢维修总厂将发挥其功能,使高速铁路系统能达到安全可靠,舒适,便捷之目的。 |
| 10. | Maintenance station s construction duration is from july , 2003 to sept . 2005 . after its completion , yan - chao maintenance factory can function smoothly , and it will make the high speed railway system safer , reliable , more comfortable and more convenient 总铁厂之施工期为92年7月到94年9月,待完工燕巢维修总厂将发挥其功能,使高速铁路系统能达到安全、可靠,舒适,便捷之目的。 |