| 1. | Measurement of smoke density of cables burning under defined conditions . part 2 : test procedure and requirements 电缆或光缆在特定条件下燃烧的烟密度测定第2部分:试验步骤和要求 |
| 2. | Tests for electric cables under fire conditions - circuit integrity - part 25 : procedures and requirements - optical fibre cables 在火焰条件下电缆或光缆的线路完整性试验第25部分:试验步骤和要求光缆 |
| 3. | Tests for electric cables under fire conditions - circuit integrity - part 23 : procedures and requirements - electric data cables 在火焰条件下电缆或光缆的线路完整性试验第23部分:试验步骤和要求数据电缆 |
| 4. | Tests for electric cables under fire conditions - circuit integrity - part 21 : procedures and requirements - cables of rated voltage up to and including 0 . 6 1 . 0kv 在火焰条件下电缆或光缆的线路完整性试验第21部分:试验步骤和要求额定电压0 . 6 1 . 0kv及以下电缆 |
| 5. | Rotating electrical machines - part 18 : functional evaluation of insulation systems - section 32 : test procedures for form - wound windings - electrical evaluation of insulation systems used in machines up to and including 50 mva and 15 kv 旋转电机.第18部分:绝缘系统功能评定.模绕组的试验步骤.功率小于等于50mva绝缘系统的电气评定 |
| 6. | Rotating electrical machines - part 18 : functional evaluation of insulation systems - section 33 : test procedures for form - wound windings - multifactor functional evaluation - endurance under thermal and electrical stresses of insulation systems used in machines up to and including 50 mva and 15 kv 旋转电机.第18部分:绝缘系统功能评定.模绕组的试验步骤.功率小于等于50mva , 15kv绝缘系统的电气应力和热应力的强度 |
| 7. | Based on consulting a large number of documents , the paper firstly analyses and generalizes all aspects of the creep tests , including test equipments , test methods , test procedure , test influencing factors ; so as to complete the creep tests successfully 在查阅大量文献资料的基础上,先介绍了蠕变试验方面所涉及到的试验仪器、试验加载方式、试验破坏标准及试验步骤,同时分析了影响蠕变试验结果的因素,明确这些有助于顺利地开展蠕变试验。 |
| 8. | This paper analyses the character and difficulty of batch control , researches realization technique of batch control based on pcs , presents logic interlock model between testing steps and circuitry switcher , and motor testing field control scheme . shcan2000 system , the hardware and software design and realization are also deeply discussed 本文分析了间歇控制的特点和难点,研究基于现场总线控制系统实现间歇控制的方法,提出了试验步骤与线路开关逻辑互锁模型和电机试验现场控制方案。 |
| 9. | The thermal distortion test of 5x8 sub - array panel was done in high temperature and normal pressure environment . the methodology , procedure and results of thermal distortion test are explained in detail . the test shows the differences between measuring results and fea analyzing results are quite limited 介绍浙江大学博士学位论文空间4 10米可展开天线的动力耦合分析及实验技术研究韦娟芳了常温高温下的5x8子阵板的热变形试验,包括试验方法、试验步骤以及数据采集设备。 |
| 10. | In this paper , it was summarized that effectiveness of an ultrafiltration device , different sizes of an ultrafiltration device , the concentration of dietary enzyme - hydrolysed casein , animal trial process and results of using enzymehydrolysed casein , respectively , on enzyme - hydrolysed casein method for determining endogenous ileal amino acid excretion in the pig 摘要分别从超滤管用于酶解酪蛋白测定的可行性、不同规格超滤管对酶解酪蛋白测定的影响、酶解酪蛋白的适宜添加量、酶解酪蛋白应用的动物试验步骤以及酶解酪蛋白测定效果等方面,对酶解酪蛋白方法测定猪回肠内源性氨基酸排泄量进行了综述。 |