| 1. | Design specification for concrete gravity dams 混凝土重力坝设计规范 |
| 2. | Stress of gravity dam with ansys 的混凝土重力坝应力研究 |
| 3. | Hydraulics study on heightened scheme of danjiangkou project 丹江口混凝土重力坝后期加高新老混凝土结合问题研究 |
| 4. | Analysis of effect of precrack in roller compacted concrete gravity dam 整体式碾压混凝土重力坝预裂缝的效应与分析 |
| 5. | Analysis of seepage characteristics of jiangya roller compacted concrete gravity dam 江垭碾压混凝土重力坝渗流特性分析 |
| 6. | The reinforced concrete face - slab is adopted as impervious body by long tan rcc dam 龙滩碾压混凝土重力坝采用钢筋混凝土面板作为防渗体。 |
| 7. | Study on effects of transverse joints space on thermal stress of jinanqiao rcc gravity dam 横缝间距对金安桥碾压混凝土重力坝温度应力的影响研究 |
| 8. | The simulation of initial concrete damage and its application in earthquake analysis of gravity dams 混凝土初始损伤模拟和在混凝土重力坝抗震分析中的应用 |
| 9. | Numerical simulation for the demage of concrete gravity dam under horizontal penetration and explosion of gbu 制导炸弹水平侵彻爆炸作用下混凝土重力坝毁伤效应数值仿真 |
| 10. | It also includes a consideration of possible alternatives , such as a concrete gravity dam or an earth - fill embankment dam 还要考虑到可能的备选方案,比如是选择混凝土重力坝还是选择填土筑堤大坝。 |