| 1. | Distortion monitoring on intake of underground power station at the right bank in tgp 三峡工程右岸地下电站进水口施工期变形监测及特征 |
| 2. | Anchorage cable construction on intake side slope and quality control in sanxia underground power station 三峡地下电站进水口边坡锚索施工及质量控制 |
| 3. | Vibration safety monitoring of high side slope under explosive excavation in underground power station inlet of right bank of three gorges project 三峡右岸地下电站进水口高边坡开挖爆破震动安全监测 |
| 4. | The underground tunnels of right - bank of the three gorges of yangtseriver are located in the right bank . its workshop hole pressured and parallelly disposed by one engine with one hole 长江三峡水利枢纽地下电站位于长江右岸,其厂房引水洞为有压洞,按“一机一洞”平行布置。 |
| 5. | The paper analyses cfd commercial soft in - depth , puts forward some problems when cfd commercial softs are used in he underground excavation cluster of hydropower station and corresponding resolvent 本文首先对目前常用的cfd商用软件进行了深入地分析,并提出了其在地下电站应用中的一些问题以及相应的解决方法。 |
| 6. | This thesis uses the cfd soft ware - fluent , realizes the simulation of air distribution . the simulation offers guidance to the optional design of the air distribution of this type of problem 本文通过运用cfd软件,实现了地下电站高大厂房几种送回风方式的数值模拟,可为此类高大空间建筑气流组织的优化研究提供参考。 |
| 7. | Ventilation at one end of vault is accustomed used in main workshop of underground hydropower station , the flux uniformity of the outlet influences how the basic network cell model - - - - blast vault should be established in network simulation 地下电站主厂房常采用拱顶一端送风进行送风,其各个风口的送风均匀性直接关系到主厂房送风拱顶这一网络基元在网络模型中应如何图化。 |
| 8. | In this paper , basing on the data analysis and stimulating analysis of the concrete liner of the water diversion tunnel of the underground hydropower station in the right bank of the tgp , the distribution and influential factors of the thermal - creep stress of thick concrete liners with big diameters in the tgp are studied . the following several problems have been solved : 1 本文基于三峡工程右岸地下电站引水洞衬砌混凝土施工期监测资料和仿真计算分析,探讨了三峡工程中大洞径、厚衬砌混凝土在当前施工工艺下施工期温度应力的分布规律及影响因素,全文主要进行了以下几个方面的工作: 1 |
| 9. | They are jet formula method , cfd method and model experiment method considering the great many merits of cfd method such as easily applying to complex geometric , independent of experiential parameters and easily simulate for many conditions and so on , this thesis use cfd method to study of the air distribution of certain pratical project 对于地下电站高大厂房气流组织的研究目前有三种方法:射流公式法、 cfd方法、模型实验法。 cfd方法以其易于适用复杂几何形状,不依赖经验参数,易实现多工况模拟等诸多优点而倍受青睐,因此,本文采用cfd方法对某一实际工程进行了气流组织研究。 |
| 10. | The paper studies the the flux uniformity of the outlet when ventilates at one end of vault in the main workshop of xiluodu underground hydropower station via the method of numerical simulation cfd , puts forward means which can achieve symmetrical ventilation , validates the cfd results credibility by the way of model experiment afterward 本文采用cfd数值模拟的方法对溪洛渡地下电站主厂房拱顶一端送风的均匀性进行了研究,提出了实现均匀送风的手段,然后用相似模型实验进行了验证,并据此提出了均匀送风拱顶与非均匀送风拱顶的网络基元模型。 |