Mobile
Log In Sign Up
Home > english-chinese > "关键路线" in Chinese

Chinese translation for "关键路线"

critical path

Related Translations:
关键备件:  critical spare parts
关键区:  key area
关键相位:  change interval
关键车流:  saturation flow rate
关键绩效:  key performance
关键原子:  key atom
成功关键:  keys to success
关键步骤:  committed stepcritical step
关键日期:  material date
关键概念:  keyconceptt
Example Sentences:
1.The critical path method was originally developed to solve scheduling problems in an industrial setting .
关键路线方法最初的发展是为了解决一项工业安装的安排问题。
2.Allen's path, which we have shown in boldface type, is the only critical path in the project of travelling to los angeles .
爱伦的路线是到达洛杉机商谈工作的唯一关键路线,在图上用粗黑线表示。
3.Cpm critical path metho
关键路线
4.Critical path method
关键路线
5.161 on our most projects critical path method ( cpm ) is used for scheduling
在我们的大多数工程项目中都采用“统筹法” (即关键路线方法,简称cpm )安排计划。
6.Meanwhile , it sets up the definition and calculation of fuzzy time parameter based on it . and it gives the new definition of fuzzy key liner , advances fuzzy sub - key line and the new algorithm about the new fuzzy key line
在新提出的模糊最大(最小)定义的基础上,定义了新的模糊关键路线,并提出了模糊次关键路线,提出了新的模糊关键路线计算方法。
7.The generation is coinciding with the probability distribution for the same work procedure . for one turn of simulation , the rigid network plan algorithm is used . after enough turns of simulation , the distribution of the total work period can be determined , at the same time the critical path and time parameters can be found in the pnp
本文首先论述了网络计划发展的几个方面,然后引入概率理论与统计知识,建立起一个概率型网络计划模型,在此基础上阐述了工序工期与网络总工期的概率分布的判定与拟合方法,通过中心极限定理同时辅助于计算机数值仿真法,对网络计划做出了一些统计分析,同时提出了概率型网络的关键路线的确定方法。
8.Aiming at the concrete need in srttep construction and embodying the managing theory of the combination of the prearranging programming and comprehensive control , the article proposes the cpm - based schedule operating program of srttep on the basis of the relationship among schedule program , cost and quality which thus realizes the close combination of schedule program and project control ; based on the comparative analysis of experience estimation method , factor estimation method , wbs estimation method and comparison estimation method , the cost controlling strategy is worked out that attaches importance to the srttep cost budget and market economy situation . meanwhile , comprehensive quality management theory is introduced in the project " s schedule program . aiming at subsidiary project bidding , equipment purchase , essential quality inspection , detailed quality insurance system and rules are worked out so as to achieve the goal of high - quality construction of srttep
( 3 )针对川塔项目施工建设具体需要,在充分体现项目事前规划与全面控制相结合管理思想和所进行的项目wbs结构分解基础上,基于项目进度? ?费用成本? ?质量三者之间的关系,提出了基于cpm关键路线法的川塔项目进度计划制定方案,实现了进度规划与控制的紧密结合;在对比分析经验估算法、因素估算法、 wbs估算法、类比估算等方法和技术基础上,制定了侧重于预算的川塔项目成本基本规划方法,以及结合市场经济情况的成本控制策略;同时将全面质量管理思想,引入了项目施工方案中,针对子项目招标、设备采购、重点质量监控点等设立了详细的质量保障机制和细则,以确保达到工程优质建设的目标。
9.At the same time , we brought forward a probability model of time limit for a project under the condition that it was n ' t definite according to the character of the mould project , and studied the method of calculating the indefinite critical route , and used this model to predict the rate of progress of a project
同时,我们根据模具项目的特点给出了任务工期不确定性情况下的工期概率模型,研究了这种非确定型关键路线的计算方法,并并利用该模型对于项目完工的进度进行了预测。
10.By comparing the results of the living example , it analyzes the inconsequence of the old algorithm about the key line of the fiizzy network and verifies the rationality of the new method based on the new definition advanced . it offers a new means to calculate project time limit about indefinite item planning - management
通过实例计算结果比较,分析了以前模糊网络关键路线算法的不合理性,证实了本文提出的新的定义下模糊关键路线法的合理性,为非确定性项目计划管理提出了新的工期计算方法。
Similar Words:
"关键路径会计" Chinese translation, "关键路径计算" Chinese translation, "关键路径时间" Chinese translation, "关键路径算法" Chinese translation, "关键路径网络图" Chinese translation, "关键路线,重要途径" Chinese translation, "关键路线编排" Chinese translation, "关键路线程序" Chinese translation, "关键路线法" Chinese translation, "关键路线法进度" Chinese translation