| 1. | First berth at terminal no . 9 operational in 2003 九号货柜码头首个泊位明年运作 |
| 2. | Container terminal no . 9 九号货柜码头 |
| 3. | Container terminal 9 contractor granted permit to dispose highly contaminated dredged mud in mainland waters 九号货柜码头承建商获发许可证在内地水域倾倒严重污染的淤泥事件 |
| 4. | The container terminal 9 is under construction in south - east tsing yi and expected to be completed by 2005 位于青衣东南的九号货柜码头,现正动工兴建,预计在二零零五年落成。 |
| 5. | For maritime transport , the remaining four berths of container terminal 9 will come on stream in 2004 and 2005 海运设施方面,九号货柜码头馀下的四个泊位将于今明两年陆续投入运作。 |
| 6. | Speech by the secretary for economic development and labour , mr stephen ip , at the opening ceremony of container terminal 9 经济发展及劳工局局长叶澍?出席九号货柜码头开幕典礼讲辞(英文版) |
| 7. | Speech by the secretary for economic development and labour , mr stephen ip , at the opening ceremony of container terminal 9 经济发展及劳工局局长叶澍?出席九号货柜码头开幕典礼讲辞(英文版) |
| 8. | The construction of viaduct ramps linking the mainline and the road networks within the vicinity of container terminal no . 9 . ; and 兴建高架道路引路连接干线主路及九号货柜码头一带的道路网络及 |