龙羊峡 meaning in Chinese
longyang xia
Examples
- Computer monitoring system operating analysis of longyangxia hydraulic power station
龙羊峡水电站计算机监控系统运行分析 - The economic operation model of long yangxia power station is established and the actual operation results in 2001 are examined
在此基础上,针对龙羊峡电站的实际情况,建立了龙羊峡水电站经济调度考核模型,并对2001年的实际调度运行进行了考核。 - Viewing the overall condition , this numerical value can reflect the fill condition of inner mongolia section since the longyangxia reservoir putting into operation in 1986
总体看,这一数值可以反映1986年龙羊峡水库运用以来内蒙古河道的淤积情况。 - Longyang gorge 320mw hydrogenerator is taken for example and the calculating results and the measured results are compared to test the accuracy of calculation
以龙羊峡320mw发电机为例进行了计算,将理论计算结果与实验结果进行了比较,验证了计算的准确性。 - Longyang gorge 320mw hydrogenerator is taken for example and the calculating results and the measured results are compared to confirm the accuracy of calculation
以龙羊峡320mw发电机为例进行了计算,将理论计算结果与实验结果进行了比较,验证了计算的准确性。