预埋钢板 meaning in Chinese
preembedding armor platee
Examples
- The earthing part is led to the top of foundation with 12 round steel or 30x4 flat steel and be welded with pre - buried steel sheet , the earthing resistance meets the demand of local electric power office
接地网分别用12圆钢或304的扁钢从两侧引入基础顶部与预埋钢板焊牢,接地电阻符合当地的电力部门要求 - Top - directly as a basis and foundation of the bearing surface as the top - embedded steel bearings or bearing surface , the supporting surface , the anchor bolt ( anchor ) position should be consistent with the allowable deviation of norms
基础顶面直接作为柱的支承面和基础顶面预埋钢板或支座作为柱支承面时,其支承面、地脚螺栓(锚栓)位置的允许偏差应符合规范的规定。