隧道顶板 meaning in Chinese
tunnel roof
Examples
- Research on choosing minimal rock cover and analysing stability of xiamen subsea tunnel
厦门海底隧道顶板厚度选择及其开挖稳定性分析 - With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake , as well as for excavated field , in line with railway engineering anti - earthquake design specification , dynamic triaxial tests and theoretical analysis using efficient stress method , the author comes to the conclusion that , when metro plate is located at layer s and the layer is thick , liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate , or arch sides at the top of metro in most places
摘要采用铁路工程抗震设计规范、动三轴试验及有效应力的理论分析相结合的方法,对南京地铁南北线( 1号线)区间隧道开挖后其地基土在7度地震情况下的土层液化情况进行分析得出:当隧道底板坐落在5层且5层较厚时的液化区出现在隧道衬砌底板处;局部地段液化区出现在隧道顶部及拱腰;大部分地段的液化区出现在隧道顶板上方。