隧道工 meaning in Chinese
sand hog
sandhog
Examples
- Crossing the mountains games - 4455 miniclip games
深山隧道工小游戏- 4399小游戏 - Assessment of site conditions is necessary to ascertain suitability for the mf method . these include geological conditions , underground water table levels and overlying soil thickness , and all other relevant factors
(六)多圆形潜盾隧道之施工条件探讨,对多圆形潜盾隧道工法之适用地质、覆土深度及其他限制条件需一并考量。 - It is also necessary to reconsider station functional arrangements , such as passenger mobility , and the locations of the passenger agent s office , station management office , and electric and mechanical room . all of these factors must be carefully assessed , since side platforms are to be constructed using the mf method
(七)旅运量与营运模式之探讨,由于车站如以多圆形潜盾隧道工法施作,其月台型式将为侧式月台,对旅客动线及相关站务人员、机房之安排需重新考量。 - To minimize worsening of traffic congestion and taking environmental and visual concerns into consideration , most mrt system routes in metropolitan areas are underground . except for those stations and crossovers where wide ranging areas are involved , the tunnel boring machine is usually applied . conventional tunnel boring was first adopted in 1818 in london , but at that time was only used on a one - line circular tunnel basis
为减少对交通之冲击及环境之影响,一般于都会区大众捷运系统之路线划皆以地下化为主,而整条路线除大面积开挖之地下车站及转辙段外,其馀皆以潜盾隧道工法作为设计之主要考量。