钢筋配置 meaning in Chinese
location of reinforcement
Examples
- The calculation results of deformation and internal force have been obtained , with which the experimental results are compared . finally , based on the experimental study and theoretical analysis , with the reference of practical calculation method given by related code of concrete structure in time , the practical calculation method and the design suggestion of coal unloading chute with skew beam are brought forward . the method is both reasonable and simple , and the calculated results are in good agreement with that of the experiment
最后,在试验研究和有限元分析的基础上,参考有关现行规范对同类结构的设计方法,提出了斜梁式浅埋箱形卸煤沟结构的简化计算模型;针对卸煤沟的特点,提出了相应的构造措施及钢筋配置方式要求;根据地下结构的动态反应特性、主要破坏特征及震害分析,提出了卸煤沟避免地震破坏的措施。 - Have to out : 1 temperature constructional reinforcing not can place in heat area to mass concrete design . temperature constructional reinforcing of bottom of mass concrete need content that owing to temperature change produce bottom control stress smaller than anti - pull strength at the same . get minimum rate of reinforcing to content construct request
得出: 1在大体积混凝土结构的温度构造钢筋配置中,构造钢筋不宜放置于高温区;大体积混凝土的底部温度构造钢筋应满足温度变化产生的底部约束拉应力小于混凝土同龄期的抗拉强度的要求,从而求出抗拉要求的最小配筋率。