×

钢斜拉桥 meaning in Chinese

steel deck cable stayed bridge

Examples

  1. Making reference to the anqing changjiang river highway bridge construction and the construction control , firstly , this paper studies the philosophy of the cable - stayed bridge construction control simulation analysis systematically , and pays much attention to the theory of simulating the construction process : backward analysis and forward analysis . then on the basis of introducing the construction process of the anqing changjiang river highway bridge , analysis the construction course fully , and analysis comparatively the result of each girder segment construction simulation , and study the variation philosophy of the line style of large cable - stayed bridge during construction
    本文紧密结合安庆长江公路大桥的主梁施工及施工控制实践,首先系统地分析了斜拉桥施工控制仿真计算的整体思路,并重点分析探讨了斜拉桥施工过程计算的理论:理想倒退分析和实时前进分析,然后在介绍安庆长江公路大桥主桥施工过程的基础上,全面地计算分析了全桥的施工过程,并且应用施工过程计算结果,对每一个梁段的施工模拟工况进行对比分析,研究了大跨度钢斜拉桥在施工过程中的线形变化规律。

Related Words

  1. 斜拉桥
  2. 混凝土斜拉桥
  3. 独塔斜拉桥
  4. 多塔斜拉桥
  5. 束式斜拉桥
  6. 星式斜拉桥
  7. 杨浦斜拉桥
  8. 双塔斜拉桥
  9. 单索面斜拉桥
  10. 双索面斜拉桥
  11. 钢象
  12. 钢楔
  13. 钢屑
  14. 钢屑, 废钢料
PC Version

Copyright © 2018 WordTech Co.