进度分析 meaning in Chinese
schedule analysis
Examples
- The unit manufacture domestically causes the unit to make lags frequently in the plan , therefore the software will install to the unit manufacture and the unit carries on the progress analysis and the adjustment has the help
机组国产化使机组制造常常滞后于计划,因此软件对机组制造与机组安装进行进度分析与调整将有所帮助。 - It can deal with much information of satellite project through orderly and effective computer management . at the same time , it has a lot of decision support function , such as cost analysis , schedule analysis , performance analysis , risk analysis , effectiveness analysis
它不仅能够对卫星工程项目的大量信息进行有序、高效的计算机管理,而且具有费用分析、进度分析、指标分析、风险分析、效能分析等辅助决策支持功能。 - At the present time , there are some kinds of project management software . these software try to perfect the highway engineering project management from the drawing up of tempo planning , the controlling of the tempo and cost to the analysis of the practical tempo at the angle of economy type
目前已有多种项目管理软件,力图从实用的角度分析在工程项目管理过程中,从进度计划的编制、进度、费用控制、实际进度分析等方面完善公路工程项目管理。 - It elucidates the grade and layout of the construction diversion structures , testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 % , q = 275 . 2m3 / s ) during the post - flood period , was made by hydraulic calculation , structural design , investment comparison , progress analysis and investment risk analysis
文中说明了施工导流建筑物的等级、水工布置。通过水力学计算、结构设计、导流方案投资比较、进度分析和投资风险分析,说明了四湖沟水利枢纽工程采用围堰挡汛后时段洪水导流方案的合理性和经济性,为施工决策提供理论依据。