×

辅助工时 meaning in Chinese

nonproductive time

Examples

  1. Application of skilled curve in computer - aided time quota system
    熟练曲线在计算机辅助工时定额系统中的应用
  2. Man - hour rationing is an important and basic work for the modern enterprise management . with the development of the technology , it is necessary to improve the quality and efficiency of the man - hour rationing by using computer aided technologies
    工时定额是现代企业管理的一项关键性基础工作;随着科技的发展,为提高企业工时定额制订工作的水平、质量和效率,利用计算机系统辅助工时定额工作势在必行。
  3. The overall frame of the computer - aided time quota predetermining system software ( catqps ) was designed and two core function modules , namely the standard datum management module and the time quota predetermining model module were put into reality
    论文完成了“计算机辅助工时定额测算系统( computeraidedtimequotapredeterminingsystem , catqps ) ”的软件总体框架设计以及标准资料管理和定额测算模型管理等两个核心功能模块的系统实现。

Related Words

  1. 工时标定
  2. 工时清单
  3. 工时消耗
  4. 标准工时
  5. 工时研究
  6. 正常工时
  7. 工时数据
  8. 损失工时
  9. 工时测量
  10. 固定工时
  11. 辅助工人
  12. 辅助工人工资支出
  13. 辅助工业;支持工业
  14. 辅助工艺方法,外围制造方法
PC Version

Copyright © 2018 WordTech Co.