设计潮位 meaning in Chinese
design tide level
Examples
- Application of a calculation method of design tide levels in constructing ports in deepwater areas
一种设计潮位推算方法在深水筑港中的应用 - The results showed that the calculation precision of the method is relatively high , and it is reasonable and feasible to use it to determine the design tide levels of constructing ports in deepwater areas
结果表明:该方法有较高的计算精度,用于确定深水筑港的设计潮位是合理的、可行的。 - The calculation method of design tide levels based on a numerical model of tidal current was expounded , was verified by means of real data , and was applied to a real engineering
文章探讨了确定深水筑港设计潮位的一种方法,阐述了基于潮流数学模型的设计潮位推算方法,用实际资料验证了该方法。 - Second , on the basis of supplementing basic data and investigating the historic tidal level , the design tidal level has been analyzed and calculated . as the result of the comparison between p - iii type frequency curve and gumbel curve , the p - iii curve is recommended
其次,在插补延长基本资料、历史潮位考证的基础上,进行了设计潮位的分析计算,并分别就采用p -型曲线及gumbel曲线两种线型适线进行比较探讨,推荐采用p -型曲线适线成果。 - Hydrology regime and river channel evolution become complex because of double influences of river flow and tide . there is little appropriate method so far . therefore , when the impact us assessed of water project on flood control , the following aspects should be focused on , river evolution and stability of project - sections , design tidal level , flood - tide combination scheme , pre - project and post - project impacts on river channel , water level and flow condition
长江河口段为潮流河段,径流潮流的双重作用使得区域水文情势、河道演变规律错综复杂,开展防洪影响评价研究时,河道演变及工程段稳定性分析,设计潮位的分析计算,洪潮组合方案拟定,工程前后对河道及水位流态影响的模拟等均是目前尚无十分成熟的方法,需要进一步研究的课题。