×

计划停机 meaning in Chinese

planned outage
planned stop
scheduled outage

Examples

  1. Nonscheduled down time
    计划停机时间
  2. Scheduled down time
    计划停机时间
  3. Instead , you can have a short planned downtime - just enough time to replace the dead drive
    相反,您只须短时的有计划停机只需留出更换坏驱动器的时间即可。
  4. Triggered downtime allows you to define downtime that should start at the same time another downtime starts ( very useful for scheduling downtime for child hosts when the parent host is scheduled for flexible downtime )
    停机触发允许您定义在停机的同时停止另一个(这对于主机计划停机的同时停止其子机是十分有用的) 。
  5. As acoustic leakage detection technology for power plant boiler tubes can detect small leakages early in boiler tubes before they become catastrophic leakages and reduce economic loss resulted from disarranged stopping of boilers , many research institutes have begun to pay attention to it
    <中文摘要> =锅炉炉管泄漏声学监测技术由于能够在电站锅炉炉管发生轻微泄漏时就可监测到泄漏的发生情况,减少由于非计划停机带来经济损失,因此引起了国内外许多研究机构的重视。

Related Words

  1. 停机命令
  2. 停机煞车
  3. 正常停机
  4. 请求停机
  5. 停机重量
  6. 停机程序
  7. 停机线
  8. 服务器停机
  9. 突然停机
  10. 停机软件
  11. 计划停工
  12. 计划停工时间
  13. 计划停机时间
  14. 计划停输
PC Version

Copyright © 2018 WordTech Co.